Laserfiche WebLink
• experience who are appointed to fulfill these re;sponsibilities. When necessary, the assistance of the NSP <br />shoulcfl be requested through the FEMA Projec~t O~cer, Kevin Long. <br />In addition, the NSP is required to caordinate project issues with the responsible Mapping Par~ner that <br />created the MAS deliverable or portions of the MAS deliverable product and will document all such <br />coordination activities with the CTP and FEIVLA. <br />Se~tion 12 Project Coordination <br />Throughout the project, all members of the Prc ject Team will coordinate, as necessary, to ensure the <br />products meet the technical and format specifii;ations required and contain accurate, up-to-date <br />information. Coordination activities may inclcide: <br />• Meetings, teleconferences, and videoG~nferences with FEMA and other Project Team members <br />as needed; <br />• Telephone conversations with FEMA ~and other Project Team members as needed; <br />• Updates to the MICS, MNUSS database, and other FEMA status information systems in <br />accordance with requirements in Volumes 1 and 3 of Guidelines mtd Spec~cations for Flood <br />Hazard Mapping Partners; and <br />• E-mail, facsimile transmissions, and le;tters, as required. <br />~ <br />Mapping Activity Statement No. 11: Montezurr~a County 15 <br />Colorado Water Conservation Board <br />