Laserfiche WebLink
~ <br />• <br />• <br />Table 1-2. Summary of Project Activities and Assignments <br /> <br />. <br />Activity l: Pre-Scoping <br /> <br />X . <br />, <br />X <br />Activity 2: Scoping X <br />Activity 3: Field Su~veys and Reconnaissance X <br />A.ctivity 4: Topographic Data Development ~ <br />A.ctivity 5: Independent QA/QC Review of Topographic Data X <br />A,ctivity 6: Hydrologic Analyses X <br />A,ctivity 7: Independent QA/QC Review of Hydrologic Analyses X <br />A~ctivity 8: Hydraulic Analyses ~ <br />~~ctivity 9: Independent Q.A/QC Review of Hydraulic Analyses X <br />~~ctivity l0: Floodp(ain Mapping (Detailed Riverine or Coastal Analysis) X <br />~ctivity 10A: Floodptain Mapping (Red~lineation Using Effective Flood <br />F'rofiles and Updated Topographic Data) X <br />Activity l OB: Floodplain Mapping (Refinement or Creation of Zone A) X <br />Activity 11: Independent QA/QC Review of Floodplain Mapping <br />(Revised Areas) X <br />Activity 12: Base Map Acquisition X <br />~ctivity L 3: DFIRAri Production (Non-R.evised Areas) X <br />Activity 13A: Indeipendent QA/QC Revnew of DFIRM Production (Non- <br />]Zevised Areas) X <br />,Activity 14: DFIRA~I Production (Mergi~lg Revised and Non-Revised <br />1[nformation) X <br />,Activity t4A: DFIRM Production (Appiication of FEMA Graphics and <br />'.Database Specifica~tions) x <br />Activity 14B: Independent QA/QC Review of DFIRM Product Meeting <br />FEMA Graphics and Database Specifications X <br />Activity 15: Preliminary DFIRM and F1:S Report Distribution X X <br />Activity 16: Post-Preliminary Processing X X <br />Activity 17: Outre~ch X <br />Mappiing Activity Statement No. 10: <br />Coloraido Water Conservation Board <br />i` -~ <br />Montezuma Cou ~~ <br />~ _,~ <br />4 <br />