My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Montezuma (2)
CWCB
>
Grants
>
DayForward
>
Montezuma (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 12:17:55 PM
Creation date
1/6/2009 11:43:40 AM
Metadata
Fields
Template:
Grants
Applicant
Anderson Consulting Engineers, Inc.
Grant Type
FEMA
Fiscal Year (i.e. 2008)
2005
Project Name
Montezuma County DFIRM Project
CWCB Section
Watershed & Flood Protection
Contract/PO #
C154035
Grants - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />• <br />C~ <br />Table 1-2. Summary of F'rojec~t Activities and Assignment~s <br />. <br /> <br />Activity l: Pre-Scoping <br />. <br />Activity 2: Scoping <br />Activity 3: Field Surveys and Reconnais:sance <br />Activity 4: Topographic Data Developm~ent <br />Activity 5: Independent QA/QC Review of Top~ographic Data <br />Activity 6: Hydrologic Analyses <br />Activity 7: Independent QA/QC Review of Hydrologic Analyses <br />Activity 8: Hydraulic Analyses <br />Activity 9: Independent QA/QC Reviev~~ of Hydraulic Analyses <br />Activity 10: Floodplain Mapping (Detailed Riverine or Coastal Analysis) <br />Activity 10A: Floodplain Mapping (Reclelineat.ion Using Effective Flood <br />Profiles and Updated Topographic Data) <br />Activity l OB: Floodplain Mapping (Refinement or Creation of Zone A) <br />Activity 11: Independent QA/QC Review of Fl~~odplain Mapping <br />(Revised Areas) <br />Activity 12: Base Map Acquisition <br />Activity 13: DFIRM Production (Non-P:evised Areas) <br />Activity 13A: Independent QA/QC Review of ]DFIRM Production (Non- <br />Revised Areas) <br />Activity 14: DFIRM Production (Merging Reviised and Non-Revised <br />Information) X <br />Activity I~A: DFIRM Production (Application of FEMA Graphics and <br />Database Specifications) X <br />Activity 14B: Independent QA/QC Review of ]DFIRM Product Meeting <br />FEMA Graphics and Database Specific~~tions X <br />Activity 15: Preliminary DFIRM and FI:S Repo~rt Distribution <br />Activity 16: Post-Preliminary Processing <br />Activity 17: Outreach X <br />Mapping Activity Statement No. 11: Montezurna County} <br />Colorado Water Conservation Board <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.