Laserfiche WebLink
• Section 6-Schedule <br />The activities documented in this MAS shall b~° complleted in accordance with the project schedule shown <br />in Table 6-l. If changes to this schedule are required, the responsible Mapping Partner shall coordinate <br />with FEMA and the other Mapping Pariners in a timely manner. <br />Table 6-1. Project Schedule <br />• <br />• <br />. <br />.~ <br />,. <br /> . , <br />Activity 1- Pre-Scoping CWCB, FEMA/NSP 3/30/OS <br />Activity 2- Scoping CWCB, FEMA/NSP 5/15/OS <br />Activity 3- Field Surveys and Reconnaissance CWCB 9/30/OS <br />Activity 4- Topographic Data Development CWCB 9/30/OS <br />Activity 5- Independent QA/QC Review of Topograpliic Data FEMA/NSP 10/30/OS <br />Activiry 6-Hydrologic Analyses CWCB 10/30/OS <br />Activity 7-Independent Qt~IQC Review of Hydlrologic Analyses FEMA/NSP 11/15/OS <br />Activity 8- Hydraulic Analyses CWCB 1/15/06 <br />Activity 9- Independent QA/QG Review of Hydraulic Analyses FEMA/NSP 2/7/06 <br />Activity 10 - Ploodplain Mapping (Detailed Ri~~erine) CWCB 3/7/06 <br />Activity IOA - Floodplain Mapping (Redelineation Using Bffective CWCB 2/30/06 <br />Flood Profiles and Updated Topographic Data) <br />Activity lOB - Floodplain Mapping (Refinemeazt or Creation ofZone CWCB 2/30/06 <br />A} <br />Activity 11 - Independent QA/QC Review of Floadplain Mapping FEMA/NSP 3/30/06 <br />(Revised Areas) <br />Activity 12 - Base Map Acquisition CWCB 8/30/OS <br />Activity 13 - DFIKM Froduction (Non-Revised~ Areas~ CWCB 2/30/OS <br />Activity 13A - Independent QA/QC Review of DFIRl~~2 Produc~ipn FEMA/NSP 3/30/06 <br />(Non-Revised Areas) <br />Activity 14 - DFIRM Production (Merging Recrised and Non-Revised CWCB 4/30/06 <br />Information) <br />Activity 14A - DFIIZM Producrion (Application of DFIRM Graphics CWCB 5/30/06 <br />and Database Speeifications) <br />Mapping Activity Statement No. 'i0: Montezurria Coury#y <br />Colorado Water Conservation Board <br />43 <br />