My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11629 (2)
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
FLOOD11629 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:25:17 AM
Creation date
1/5/2009 12:18:16 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Hydrologic Basin Response - Phase II B - Parameter Estimation Guidelines
Date
3/1/2007
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11. Use Table 7 to select the appropriate dimensionless unit hydrograph and for <br />guidance in selecting K~,. <br />033 <br />12. Calculate Lag = 26 Kn ~ L o 5) • <br />S <br />D~nration: The duration of the unit hydrograph (or all unit hydrographs in a multiple <br />subbasin model) is specified in HEC-1 in the IT record as NMIN. In general, NMIN will be <br />selec:ted according to the following criteria: <br />1. NMIN equal to or less than 0.15 T~ or 0.15 Lag provides adequate definition <br />of the hydrograph peak with an optimum number of hydrograph coordinate <br />calculations. <br />2. NMIN = 0.25 T~ or 0.25 Lag is the maximum value for NMIN. <br />3. NMIN for a multiple subbasin model should be selected based on the smallest <br />T~ value for any of the subbasins in the model. <br />19 Mar~h 2007 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.