Laserfiche WebLink
remaining balance and ending in 2024. Borrower also has an outstanding line of credit <br />for this project with Guaranty Bank and Trust Company in an amount not to exceed <br />$250,000, at an interest rate of 4.9% and ending June 11, 2008. <br />SECTION 6 -ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />Borrower shall use the loan funds to extinguish the line of credit with Guaranty Bank and <br />Trust Company referenced in Section 5 above. <br />SECTION 7 -CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. Contemporaneously with the approval of this Agreement, the BORROWER'S and the <br />Engineering Consultant's plans and specifications are being submitted to the <br />CWCB staff for verification of compliance with the terms of this Contract. Any <br />modifications to the plans and specifications must be approved in writing by the <br />CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br />by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br />State Engineer's Office prior to construction. <br />D. The BORROWER has contracted for the construction of the work with responsible <br />and capable Construction Firms, which said Construction Firms was selected by <br />the BORROWER and is acceptable by the CWCB staff. <br />E. Contemporaneously with the approval of this Agreement, the BORROWER is <br />providing a copy of the executed construction contract documents consisting of the <br />contractor's proposal, construction contract, performance bond, payment bond, <br />notice of award, notice to proceed, sample change order, and sample field order, <br />as well as the advertisement for bid and bid bond at bidding. <br />F. The BORROWER shall construct the PROJECT in accordance with the approved <br />plans and specifications. <br />G. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br />the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. <br />H. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br />I. The BORROWER shall pay all of the expenses related to the PROJECT when such <br />bills are due. <br />SECTION 8 - ELIGIBLE EXPENSES. The following items are eligible for loan <br />Appendix 1 to Loan Contract C150262 <br />Page 2 of 3 <br />