Laserfiche WebLink
4/11/2008 <br />Brush Prairie Ponds <br />I. Task 1 <br />SUMMARY OF TASKS <br />• Description of task: Conduct and complete a survey and design <br />• Method or procedure that will be used or followed to accomplish the task and identify who will undertake <br />the task: Ducks Unlimited surveyors will conduct a survey of the impacted area, identified on the attached <br />map. A topographic survey will be developed from the survey using AutoCAD 12 which will illustrate the <br />6" contours of the micro topography. DU's professional engineers will work with City of Brush officials <br />to provide a detailed design of wetland impoundments, water level control structures, and water delivery <br />infrastructure. <br />• Description of the major deliverables/products that will be produced upon successful completion of the <br />task: <br />^ Deliverables will include a detailed survey and design of the wetland project for the area <br />illustrated in the conceptual plan. <br />^ Provide a detailed bid package including all plans and specifications, and quantities for <br />materials and equipment. <br />II. Personnel <br />City of Brush <br />City Manager -Monty Torres <br />Fort Morgan Canal & Irrigation Company <br />Manager -Ken Bohl <br />Ducks Unlimited, Inc. <br />Program Manager dreg Kernohan <br />Regional Engineer -Richard Vail, P.E. <br />Ducks Unlimited will submit a complete statement of qualifications to accompany this application upon <br />submission to the CWCB. <br />