My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150264 letter of Substaintial Completion
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150264 letter of Substaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2011 2:09:24 PM
Creation date
12/15/2008 8:13:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150264
Contractor Name
Lower Latham Reservoir Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROMISSORY NOTE <br />Date: June 1, 2008 <br />Borrower: Lower Latham Reservoir Company <br />Principal Amount: $670,640 <br />Interest Rate: 2.25% per annum <br />Term of Repayment: 30 years <br />Loan Contract No.: C150264, dated June 1, 2008 <br />Loan Payment: $30,983.13 <br />Payment Initiation Date*: ~~ C e'st d ~~ ~ ~ 2 c?b~' <br />Maturity Date*: ~7JP c e.,, /» ~ 1 1. C ~ ~? <br />"` Payment Initiation Date and Maturity Date fields are filled in after the project has been <br />substantially completed. <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation Board <br />("CWCB"), the Principal Amount plus Interest for the Term of Repayment, pursuant to the LOAN <br />CONTRACT and this promissory note. <br />2. Principal and interest shall be payable in equal Loan Payments, with the first payment due and <br />payable one year from Payment Initiation Date (the date the CWCB determines that the project <br />is substantially complete), and annually thereafter. All principal, interest, and late charges, if <br />any, then remaining unpaid shall be due and payable on or before the Maturity Date. <br />3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman Street, <br />Room 721, Denver, Colorado 80203. <br />4. The CWCB may impose a late charge in the amount of 5% of the annual payment if the CWCB <br />does not receive the annual payment within 15 calendar days of the due date. <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shaA not postpone the due date of any subsequent payments or change the <br />amount of such payments. <br />6. All payments received shall be applied first to late charges, if any, next to accrued interest and <br />then to reduce the principal amount. <br />7. This Note is issued pursuant to the LOAN CONTRACT between the CWCB and the BORROWER. <br />The LOAN CONTRACT creates security interests in favor of the CWCB to secure the prompt <br />payment of all amounts that may become due hereunder. Said security interests are evidenced <br />by a Security Agreement and Deed of Trust ("Security Instruments") of even date and amount <br />and cover certain revenues, real property, water rights and/or accounts of the BORROWER. The <br />LOAN CONTRACT and Security Instruments grant additional rights to the CWCB, including the <br />right to accelerate the maturity of this Note in certain events. <br />8. If any annual payment is not paid when due or any default under the LOAN CONTRACT or the <br />Security Instruments securing this Note occurs, the CWCB may declare the entire outstanding <br />Appendix 2 to Loan Contract C150264 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.