My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150262 Letter of Substaintial Completion
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150262 Letter of Substaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:03:10 PM
Creation date
12/15/2008 8:13:40 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150262
Contractor Name
Bennett, Town of
Contract Type
Loan
Water District
0
County
Adams
Arapahoe
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br />December 3, 2008 Bill Ritter lr. <br />Governor <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT Hams D. Sherman <br />DNR Executive <br />Director <br />Mrs. Tam Intermill, Town Clerk Jennifer L. Gimbell <br />Town of Bennett CWCB Director <br />P.O. Box 72 <br />Bennett, CQ 80646 Dan McAuliffe <br />CWCB Deputy <br />Director <br />Re: Contract Number C150262 -Well Number 5 Replacement Project <br />Dear Mrs. Intermill: <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />October 1, 2008. <br />In accordance with the Contract, the Town of Bennett owes $2,637.61 for interest during construction, as calculated on <br />the attached spreadsheet, due by December 22, 2008. Please make your check for interest during construction payable to the <br />Colorado Water Conservation Boazd and include the Contract Number on the check. <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $13,728.76 is <br />due on October 1, 2009. A 1% loan service fee of $2,461.09 was added to your principal balance of $246,109.22, for a final loan <br />balance of $248,570.31. An adjustment of $3,929.69 has been subtracted from your approved loan balance of $252,500.00, to <br />adjust for your final principal balance of $248,570.31. To eliminate the need to amend the loan contract, your annual payment is <br />calculated based on your authorized loan amount of $252,500.00. Please see the attached Loan Repayment Schedule and a copy <br />of the Promissory Note. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Boazd to work with the Town of Bennett on the successful <br />completion of this project. Please call if you have any questions regazding this matter or if we can be of service to you in the <br />future. <br />Sincerely, <br />~~ <br />Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Section <br />cc. Eric Wilkinson, CWCB Board Member <br />Water Supply Planning and Finance Section Contract Amount = $252,500.00 <br />Project file Expended Amount = $248,570.31 <br />Contract file <br />Flood Protection • Water Supply Planning and Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.