Laserfiche WebLink
. r.. <br />a <br />STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 86611474 <br />www.cwcb.state.co.us <br />December 3, 2008 <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br />Mrs. Penny Welch, Treasurer <br />Black Dike Ditch Company <br />14575 Road G <br />Cortez, CO 81321 <br />Re: Contract Number C 150249 -Black Dike Ditch Rehabilitation Project <br />Dear Mrs. Welch: <br />Bill Ritter Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Jeruufer L. Gimbel <br />CWCB Duector <br />Dan McAuliffe <br />CWCB Deputy <br />Director <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />October 1, 2008. <br />In accordance with the Contract, the Black Dike Ditch Company owed $10,086.60 for interest during construction, as <br />calculated on the attached spreadsheet. Payment in the amount of $10,086.60 for interest during construction was received and <br />was credited to your account on October 2, 2008. <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $13,325.84 is <br />due on October 1, 2009. A principal payment of $337,649.78 (NRCS grant funds) was received and applied to your loan balance <br />of $603,980.00 on October 2, 2008. This payment resulted in a final loan balance of $266,330.22 that your annual payment is <br />based on. A 1% loan origination fee of $5,980.00 was charged to your account. The origination fee was based on your highest <br />construction cumulative loan balance of $598,000.00. Vaughn McWilliams, our Contract Administrator, will be amending the <br />Promissory Note, contained as Appendix 2 of the Contract, to reflect the final contract loan amount. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Pazagraph A.16, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Black Dike Ditch Company on the <br />successful completion of this project. Please call if you have any questions regazding this matter or if we can be of service to you <br />in the future. <br />Sincerely, <br />~~~ <br />Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Section <br />cc. Bruce Whitehead, CWCB Boazd Member <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br />Contract Amount = $603,980.00 <br />Expended Amount = $603,980.00 <br />Final Amount = $266,330.22 <br />Flood Protection • Water Supply Planning and Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Planning <br />