My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02224
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 3:12:36 PM
Creation date
12/15/2008 8:13:37 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150222
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
72
County
Mesa
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 86611474 <br />www.cwcb.state.co.us <br />December 3, 2008 <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br />Mrs. Rita Cnunpton, Manager <br />Orchard Mesa Irrigation District <br />668 38 Road <br />Palisade, CO 81526 <br />Re: Contract Number C150222 -Stokes Siphon Replacement Project <br />Dear Mrs. Crompton: <br />Bill Ritter )r. <br />Governor <br />Hams D. Sherman <br />DNR Executive <br />Director <br />Jennifer L. Gimbell <br />CWCB Duector <br />Dan McAuliffe <br />CWCB Deputy <br />Director <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />October 1, 2008. <br />In accordance with the Contract, the Orchard Mesa Irrigation District owes $9,264.59 for interest during construction, as <br />calculated on the attached spreadsheet, due by December 22, 2008. Please make your check for interest during construction <br />payable to the Colorado Water Conservation Board and include the Contract Number on the check. <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your fast loan payment in the amount of $26,057.93 is <br />due on October 1, 2009. A 1% loan service fee of $5,399.00 was added to your principal balance of $539,900.00, for a final loan <br />balance of $545,299.00. An adjustment of $101.00 has been subtracted from your approved loan balance of $545,400.00, to <br />adjust for your final principal balance of $545,299.00. To eliminate the need to amend the loan contract, your annual payment is <br />calculated based on your authorized loan amount of $545,500.00. Please see the attached Loan Repayment Schedule and a copy <br />of the Promissory Note. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Orchard Mesa Irrigation District on <br />the successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service to <br />you in the future. <br />Sincerely, <br />Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Section <br />cc. John Redifer, CWCB Board Member <br />Water Supply Planning and Finance Section Contract Amount = $545,400.00 <br />Project file Expended Amount = $545,299.00 <br />Contract file <br />Flood Protection • Water Supply Planning and Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.