My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150205 Letter of Substaintial Completion
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150205 Letter of Substaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:17:41 PM
Creation date
12/11/2008 8:32:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150205
Contractor Name
Veits Pipeline Company
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
., <br />STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br />December 3, 2008 <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br />Mr. Dan Whitehead, Secretary <br />Number Six Ditch Company (Veits Irrigation Company) <br />P.O. Box 312 <br />Mancos, CO 81328 <br />Re: Contract Number C 150205 -Number Six Ditch Rehabilitation Project <br />Dear Mr. Whitehead: <br />Bill Ritter Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Jennifer L. Gimbel <br />CWCB Duector <br />Dan McAuliffe <br />CWCB Deputy <br />Director <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />November 1, 2008. <br />In accordance with the Contract, the Number Six Ditch Company (Veits Irrigation Company) owed $33,204.11 for <br />interest during construction, as calculated on the attached spreadsheet. Payment in the amount of $33,204.11 for interest during <br />construction was received and was credited to your account on November 1, 2008. <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $10,450.52 is <br />due on November 1, 2009. A principal payment of $470,108.74 (MRCS grant funds) was received and applied to your loan <br />balance of $688,841.21 on November 1, 2008. This payment resulted in a final loan balance of $218,732.47 that your annual <br />payment is based on. A 1% loan origination fee of $6,820.21 was charged to your account. The origination fee was based on <br />your highest construction cumulative loan balance of $682,021.00. Vaughn McWilliams, our Contract Administrator, will be <br />amending the Promissory Note, contained as Appendix 2 of the Contract, to reflect the final contract loan amount. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.16, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Number Six Ditch Company (Veits <br />Irrigation Company) on the successful completion of this project. Please call if you have any questions regarding this matter or if <br />we can be of service to you in the future. <br />Sincerely, <br />•{ <br />Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Section <br />cc. Bruce Whitehead, CWCB Board Member <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br />Contract Amount = $688,942.00 <br />Expended Amount = $688,841.21 <br />Final Amount = $218,732.47 <br />Flood Protection • Water Supply Planning and Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.