My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150230 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150230 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 9:28:20 AM
Creation date
12/8/2008 4:11:30 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150230
Contractor Name
Lincoln Park Crooked Ditch Company
Contract Type
Loan
Water District
12
County
Fremont
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LINCOLN PARK CROOKED DITCH COMPANY <br />DITCH REHABii.iTATinN <br />_.~~;~ <br />"`°': _ <br />~;_ _, ~4 <br />Proiect Descriation <br />LPCDC, a Colorado mutual ditch company, provides irrigation water to a 500-acre service area in <br />Lincoln Park, immediately south and adjacent to Canon City, in unincorporated Fremont County. <br />LPCDC has several senior water rights and diverts from the Arkansas River through the South Canon <br />Ditch. The LPCDC ditch system has several branches totaling 62,220 lineal feet (lf) or about 11.8 miles <br />in length. The ditch consists of 29,075 if of 36" and 8,5401f of 24" of concrete pipe, 16,085 if of 18" <br />concrete/PVC pipe, and 8,5201f of open ditch. The ditch suffered from significant water loss, and the <br />deteriorated pipe posed a threat to property and individuals should the pipe fail. The initial proposal was <br />to replace the most deteriorated pipe system with HDPE (High Density Polyethylene) over atwo-year <br />period, in order to stop water loss and restore system reliability. Given the cost of this alternative, <br />potential construction conflicts, and easement issues, the option was replaced with a''/2-inch polyester <br />resin felt tube pipe lining option. The liner project was bid out in September of 2007 and was awarded to <br />Western Slope Utilities, Breckenridge, Colorado, to include the 36-inch and 18-inch pipe sections. The <br />project commenced construction January of 2008 and was completed in May of 2008. <br />Proiect Data <br />Sponsor: Lincoln Park Crooked Ditch Co. County: Fremont Water Source: Arkansas River <br />Terms of Loan: $804,685.61@3.25% for 30-yrs. Substantial Completion Date: June 1, 2008 <br />Design Engineer: Stillwater Engineering, Inc. -Pueblo, Colorado <br />Construction Contractor: Western Slope Utilities, Inc. -Breckenridge, Colorado <br />Average Annual Diversion - 1,850 acre-feet <br />Completed lined section of 36-inch concrete pipe <br />
The URL can be used to link to this page
Your browser does not support the video tag.