Laserfiche WebLink
A ~ <br />Central Weld County Water District -Proposed Dry Creek Reservoir Agenda Item 20g <br />November 25-26, 2002 <br />Water Project Construction Loan Program-Project Data <br />Borrower: Central Weld County Water District County: Larimer <br />Project Name: Dry Creek Reservoir Project Type: New Reservoir <br />Drainage Basin: South Platte Water Source: CBT <br />Total Project Cost: $10,500,000 Funding Sources: CWCB, LTWD, CWCWD <br />Type of Borrower:. Municipal (Middle/High) Aver. Delivery: 5200 acre-feet <br />CWCB .Loan: $3,937,500 (50%) Interest Rate: 4.15% Term: 20 years <br />The Central Weld County Water District (CWCWD) and Little Thompson Water District- (LTWD) are <br />each applying for a CWCB loan to construct a new water storage reservoir in a 50/50 partnership. . <br />Both districts would jointly build, owri and operate the proposed reservoir. LTWD and CWCWD jointly <br />own the Carter Lake Filter Plant that treats Colorado-Big Thompson (C-BT) water. Currently, the filter <br />plant has no raw water storage facility. All water treated by the plant is delivered directly from Carter. <br />Lake to the filter plant through the St. Vrain Supply Canal. Consequently, the Districts are entirely <br />dependent on availability of water from- Carter Lake. In wet years, the Districts are unable to treat and <br />store all of the water to which they are entitled. In dry years, the Districts can have a shortage of water <br />and are forced to meet their demands with water from outside entities. -In addition, any condition that <br />would interrupt supply from Carter Lake such as maintenance to Carter Lake or the St. Vrain Supply <br />Canal also would cause interruption in .operation of the. treatment plant. The proposed project located <br />2-3 miles. southeast of Carter Lake would include construction of an approximately 5200 acre-foot <br />reservoir, including a 40-foot high. earthen dam with emergency spillway and outlet works; conversion <br />of an existing 20-inch treated water line to a raw water line to connect the reservoir to the Filter Plant, <br />'and construction of a 5000 GPM pump station to pump water from the reservoir to the Filter Plant. <br /> <br />1 ~ \'\~ I <br />I <br />I <br />LGR. /f2 <br />'~ <br />_ ..~_ .. _~~~.. _ ., ._,' _.._ LGR. /I7 _ ... _. ~ <br />_.. _ ._;_,.... _._ _- <br />~ \\ <br /> <br />1 <br />~ <br />L <br />Rsa ~~ <br />\ u i , GR. /10 <br />W. <br />. <br />u ~ <br />\ \ ~ a0 :.~~ I <br />I Senn <br />Res. <br />' ~ <br />`~' I i ~ ~ ~ ~ LGR /10 <br />\ <br />' . _ _. _ _ _. _.__ <br />_ <br />__ <br />1` <br />_ _ _.._ fle/Hw /~ LCR. /i0 ` ~ . <br />, ~ ~, Rea ~ <br />~'~ i <br />t' <br /> <br />` <br /> <br />4 <br />t ...` <br />~ .. <br />~ ~ ~ ~~ _ <br /> <br /> <br />~-` __ Y a <br /> <br /> <br />J . 56 J ^ .~. <br /> <br /> <br />~ <br /> <br /> <br />GR ~ <br /> 1 ~\ ~ o i i i w I ~ ~oymcn Red <br /> ~~`. ~~ PROP4S¢11 ~ ~"-~ . <br />~ gls'R OUP .. <br /> r <br />' <br />~ ' °~~ ~~ RL'Sls'~I;X/lR " ~~ <br />.....Res. d ----- o j ~, LGR. /sc <br />. <br /> ~ <br />~ ^ ~ `~ <br />~ ~~ ~ l i SITS" ~, . - - - -.._.:_~ ..__., _.._`". _, _ , <br />,. <br />- <br /> _ <br /> ~ ~ ~~ ~ ~ <br />Location Map <br />Page 7 of 7 <br />