My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150209 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150209 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 11:27:56 AM
Creation date
12/8/2008 4:11:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150209
Contractor Name
Central Weld County Water District
Contract Type
Loan
Water District
2
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Central Weld County Water District- Proposed Dry Creek Reservoir <br />November 25-26, 2002 <br />Agenda Item 20g <br />Table 2 shows the Financial Ratios for the District and indicates strong financial condition and <br />strong ability to repay the $3,937,500 CWCB loan. CWCWD does not plan to raise their water <br />rates, as their current rate structure provides adequate revenue in excess of expenses. <br />Table 2. Financial Ratios <br />Financial Ratio Without With project <br /> the project Future Year <br /> Aver. 1999-01 <br />Operating Ratio (revenue/expense) <br />weak: less than 100% ~ 204% 208% <br />average: 100%- 120% (strong) (strong) <br />strop : reater than 120% <br />Debit Service Coverage Ratio <br />(revenues-expenses)/debt service 196% 137% <br />weak: less than 100% (strong) (strong) <br />average: 100% - 125% <br />strop : reater than 125% <br />Cash Reserves to Current Expense <br />weak: less than 50% 511 % 550% <br />average: 50% -100°~0 ~ (strong) (Strong) <br />strop reater than 100% <br />Debt per Tap <br />weak: greater than $5000 $374 $789 <br />average: $2500 - $5000 (Strong) (Strong) <br />strop :less than $2500 <br />Monthly Water Bill <br />average: $30 $21.50 $21.50 <br />weak: greater than $60 (average) (average) <br />As security for the loan the District will pledge water revenues backed by a rate covenant and <br />annual financial reporting. This is in compliance with CWCB Loan Policy #5 (Collateral). <br />Recommendation <br />Staff recommends a CWCB loan to Central Weld County Water District, from the Severance Tax <br />Trust Fund -Perpetual Base Account, not to exceed $3,937,500 to construct the proposed Dry <br />Creek reservoir in 50/50 partnership with the Little Thompson Water District. The recommended term <br />of the loan is 20 years and the recommended lending rate is 4.15% per year. Security for the loan will <br />be a pledge of water rate revenues backed by a rate covenant and annual financial reporting. <br />Staff further recommends that final approval of the loan be conditioned upon all other standard <br />contracting provisions of the CWCB. <br />cc: John Zadel, General Manager, CWCWD <br />Duane Smith, P.E., Smith Geotechnical <br />Linda Bassi, AGO <br />Attachment <br />Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.