Laserfiche WebLink
.~~ <br />iii <br />Pump House <br /> <br />Proiect Description <br />This $2,500,000 project involves the construction of a raw water supply pipeline from the <br />Colorado River to the Town's existing water treatment facility. The pipeline project allows the <br />Town of Kremmling to access their conditional 3 cfs flow right out of the Colorado River, which <br />will be delivered to the treatment plant, released and stored at Jones No. 2 Reservoir and then used <br />to augment the town's current water supply. The Town's current water supply consists of a 6 cfs <br />flow right from Sheep Creek, which is over-adjudicated and is historically only available during <br />spring runoff. <br />Proiect Data <br />Sponsor: Town of Kremmling County: Grand Water Source: Colorado River <br />Terms of Loan: $1,653,060@4.25% for 30-yrs. Substantial Completion Date: April 1, 2007 <br />Design Engineer: R.T.W. Engineering, Inc. -Fort Collins, Colorado <br />Contractor: Duckels Construction, Inc. -Steamboat, Colorado <br />Construction Elements: 10,0001.f. -12-inch HDPE <br />2 -50 Horsepower Pumps, Pump house and Control Vaults <br />100 AF Water Purchase from River District out of Wolford Mtn. Res. <br />Average Annual Delivery: 400 acre-feet <br />TOWN OF KREMMLING <br />RAW WATER DISTRIBUTION PROJECT <br />