Laserfiche WebLink
<br /> <br /> <br /> 2) Bridge loan for $55,000 water rights purchase to be paid in full with proceeds <br />from CWCB loan. <br /> 3) CWCB will cap the initial disbursement of $523,584 (including the 1% Loan <br />Service Fee) for: preliminary engineering; th e water rights purchase of 6.0 shares <br />of Greeley Irrigation Company; the purchase and installation of measuring control <br />structures on the wells; and the construction of the recharge facility. Upon water <br />court approval of augmentation plan, $487,224 (inclu ding the 1% Loan Service <br />Fee) for the 50 acre - ft lined storage reservoir can be disbursed. CWCB staff has <br />the option of executing two contracts as deemed necessary by CWCB staff. <br /> 4) Borrower shall make annual payments of interest accrued prior to subst antial <br />completion of project. <br /> 5) If the water court application is denied or otherwise unsuccessful, the Project <br />will be deemed substantially complete and the Borrower shall repay the amount of <br />funds disbursed, along with interest, in accordance with th e loan contract <br />provisions. <br /> The motion was approved unanimously (8 - 0). <br /> <br /> b. Farmers Pawnee Canal Company Ditch Flow Control Structures Project <br />Tape 1, Track 3 03:29:58 03:34:22 <br /> A motion was made by Eric Wilkinson and seconded by Carl Trick to approve <br />staff recommendation that the Board approve a loan not to exceed $227,250 <br />($225,000 for project costs and $2,250 for the 1% Loan Service Fee) to the <br />Farmers Pawnee Canal Company for the Ditch Flow Control Structures Project <br />from the Severance Tax T rust Fund Perpetual Base Account. The terms of the <br />loan shall be a 30 - year loan at 2.5% per annum. Security for the loan shall be in <br />compliance with CWCB Financial Policy #5. <br /> The motion was approved unanimously (8 - 0). <br /> <br /> c. WRCC, Inc. Windsor Dam a nd Spillway Maintenance Project <br />Tape 1, Track 3 03:34:23 03:41:08 <br />Action: A motion was made by Eric Wilkinson and seconded by Keith Catlin to approve <br />staff recommendation that the Board approve a loan not to exceed $1,285,730 <br />($1,273,000 for project co sts and $12,730 for the 1% Loan Service Fee) to <br />WRCC, Inc. for the Windsor Dam and Spillway Maintenance Project from the <br />Severance Tax Trust Fund Perpetual Base Account. The terms of the loan shall <br />be a 30 - year loan at blended rate of 2.55% per annum. Se curity for the loan shall <br />be in compliance with CWCB Financial Policy #5. CWCB staff further <br />recommends an additional contract condition requiring full payment of the <br />Farmers Bank bridge loan with proceeds from the CWCB funds. <br /> The motion was approved unanimously (8 - 0). <br /> <br /> A motion was made by Geoff Blakeslee and seconded by Reed Dils to adjourn the <br />CWCB Board meeting. The motion was approved unanimously (8 - 0). <br /> <br />ADJOURNED 5:3 0 p.m. <br />12 <br /> <br />