Laserfiche WebLink
- 3 - <br /> <br /> <br />Water Project Construction Program Project Data <br />Non - Reimbursable Investment <br /> <br />Grantee: County: <br /> Colorado Water Conservation Board Stat ewide <br />Project Name: <br />Colorado River Water Availability Study Phase 2 <br />Project Type: <br />Water Supply Study <br />Drainage Basin: Water Source: <br />Upper Colorado River Upper Colorado River and tributaries <br />Total Study Cost: <br />$1 million, requesting $1,000,000 with thi s application <br />Funding Sources: <br />CWCB Const. Fund <br />Type of Grantee: <br />State Government <br />CWCB Non - Reimbursable Inv.: <br />Currently $1,000,000. In SB 07 - 122 the General Assembly provided $500,000 <br />to conduct the study and an additional $500,000 was appropriated i n 2008, both for Phase 1 work. <br /> <br />Summary <br />Phase 2 builds on the work that was done under Phase 1. It will focus on the analysis of water availability using <br />future water demands provided by the IBCC roundtable process. <br /> <br /> <br /> <br />Ú´±±¼ Ю±¬»½¬·±² É¿¬»® Ю±¶»½¬ д¿²²·²¹ ¿²¼ Ú·²¿²½» ͬ®»¿³ ¿²¼ Ô¿µ» Ю±¬»½¬·±² <br />É¿¬»® Í«°°´§ Ю±¬»½¬·±² ݱ²­»®ª¿¬·±² д¿²²·²¹ <br />