My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
27a (2)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
27a (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:38:02 PM
Creation date
12/3/2008 9:06:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2008
Description
CF Section - En-Bloc Non-Reimbursable Investment Recommendations - Satellite Linked Monitoring System & Flood Hardening Program
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DWR and CWCB Flood Hardening of Existing Stream Gages <br /> Page 4 <br />This technology provides for more rapid, safer, and often more accura te measurement of stream flow. <br />DWR is employing this technology to help verify and extend the middle and upper ranges of the stage- <br />relationship at key gages. <br />discharge <br />FY08 Accomplishments <br />The CWCB provided $350,000 in FY2007-08 for sate llite telemetry equipment upgrade and replacement, <br />flood hardening of stream gages, and stream gage refurbishment. <br />High Data Rate DCP Upgrade Program. Of the funds allocated, $245,000 were expended on the <br />procurement and installation of new ge neration, high data rate, satellite- linked monitoring equipment. The <br />high data rate upgrade program began in 2001. To date, 357 sate llite monitoring ga ges throughout <br />Colorado, about 80% of the current total syst em, have been upgraded from 100 baud to 300 baud <br />transmission speed. Upgrades also include new generat ion data collection platforms with on-board data <br />logging, new stage measurement equipment, ancill ary telemetry support equipment, and gage station <br />grounding equipment. <br />Streamgage Refurbishment. Of the FY07-08 funds, $55,000 along with carryover funds from the previous <br />fiscal year were used on refurbishm ent of existing stream gages throug hout the State. Refurbishment <br />projects were completed at the fo llowing stream gages in FY 2007-08. Several of these projects were <br />initiated in FY08, but not complet ed, and will carry over into FY09 for completion (these are marked with an <br />asterisk). <br />North Channel Conejos R. near LaSauses $866.25 <br />RIOSFKCO-steel for A-frame $450.29 <br />Roubideau Creek at the Mouth near Delta $14,595.00 <br />Hoosier Pass Tunnel $291.39 <br />PURTRICO - install wire weight gage $473.02 <br />TRIMTNCO backhoe work in channel $455.00 <br />ILLRANCO, MICMERCO shelte rs, stilling wells $1,933.82 <br />Willow Creek bl Steamboat Lake $3,365.07 <br />RULTOOCO/MUDTOOCO crest gage, supplies $567.95 <br />Div 7 La Plata gages-shelters and supplies $492.56 <br />Boulder Creek near Orodell-AC power $2,254.86 <br />Navajo River at Banded Peak Ranch $149.32 <br />N. Fk. Cache la Poudre bel Seaman-bank stabilization $77.52 <br />* LAPBRECO ramp flume stabilization $7,480.00 <br />* LAPCHECO ramp flume stabilization $7,120.00 <br />Razor Creek below Vouga Res $88.89 <br />Straight Creek Tunnel--SDR, shelte r, confined spac e eqpmt $4,245.41 <br />Long Hollow at the Mouth nr Red Mesa $934.68 <br />Red Mesa Ward Reservoir $2,891.58 <br />Rio Blanco River at Mouth $2,952.18 <br />Redlands Canal nr Grand Junction $451.43 <br />Div 5 valve handle extensi ons-BLUNINCO, ROABMCCO $896.90 <br />Saguache Cr near Saguache $79.45 <br />Buckeye Reservoir and Outflow gage $6,902.34 <br />* S. Platte River at Julesburg Channel 4 $1,000.00 <br />Arkansas River at La Junta $500.00 <br />Arkansas River above Pueblo $875.00 <br />West Divide Creek near Raven $621.37 <br />South Platte at Waterton $1,000.00 <br />* La Plata at Hesperus $2,580.00 <br />Big Thompson at Canyon Mouth $253.31 <br />Fountain Creek at Mouth $1,025.00 <br />* Purgatoire River at 9-mile Dam $500.00 <br />Cotton Cr.nr Mineral Hot Springs $430.00 <br />Wild Cherry Creek nr Crestone $108.25 <br />N Crestone Creek nr Crestone $54.28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.