My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02179
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 8:57:22 AM
Creation date
12/2/2008 10:04:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150275
Contractor Name
Republican River Water Conservation District
Contract Type
Loan
Water District
0
County
Lincoln
Logan
Sedgwick
Washington
Yuma
Phillips
Kit Carson
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
will reduce pumping costs and prolong the life of the regional aquifer at the <br />location where the Compact Compliance Wells will pump. <br />2. The North Fork Lease is feasible from both engineering and financial <br />perspectives. <br />3. The RRWCD Board of Directors has already increased annual use fees on <br />the diversion of water within the District to pay for the Compact <br />Compliance Pipeline. The use fees will generate sufficient revenues to <br />pay for a loan from the CWCB for the North Fork Lease and the loan for <br />the Compact Compliance Pipeline. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.