My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150274 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150274 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 8:55:30 AM
Creation date
12/2/2008 10:03:48 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150274
Contractor Name
Yuma County Water Authority Public Improvement District
Contract Type
Loan
Water District
0
County
Yuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pumped during the term of the North Fork Lease, thereby prolonging the life of the <br />aquifer in the area of the wells that will be used as Compact Compliance Wells for the <br />pipeline project. <br />YCWA PID understands that RRWCD WEA has submitted its own application to CWCB <br />Water Project Construction Fund fora $4.5 million loan to cover a portion of RRWCD <br />WEA's lease payment under the proposed North Fork Lease. The two applicants are <br />not competing against each other for the loans and each entity relies on a different <br />source of revenue for repayment of its loan. In an effort to expedite CWCB's review of <br />both applications, this study tracks the format of the feasibility study to be submitted by <br />RRWCD WEA. <br />1236811\1204400.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.