My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Yampa - Sand Wash Coalbed Methane Production Depletive Effects on Water Resources Study_Scope of Work Expand
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Yampa - Sand Wash Coalbed Methane Production Depletive Effects on Water Resources Study_Scope of Work Expand
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2012 9:25:46 AM
Creation date
11/24/2008 5:11:05 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Yampa/White
Applicant
Moffat County
Description
Sand Wash Basin Coalbed Methane Production Depletive Effects on Water Resources Study
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
150435
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hourly Labor Costs <br />Example Project Personnel: Project Modeler Senior GIS Graphics/ Staff Total <br /> Manager Geologist Specialist Designer Geologist Costs <br />Hourly Rate: $131 $150 $99 $99 $64 $75 <br />Task 1 - Research CBM 3 20 60 $6,883 <br />Production and Water <br />Production <br />Task 2 - Characterize Basin 2 24 24 12 $5,768 <br />Stratigraphy and Structure <br />Task 3 - Characterize Regional 3 24 24 12 20 $7,405 <br />Ground Water Flow Svstems <br />Task 4 - Relate Target CBM 2 20 24 $4,041 <br />Interx-als to Local Aquifers <br />Task 5 - Relate Target CBM 2 16 $1,840 <br />Inteixals to Surface Water <br />Systems <br />Task 6 - Characterize Water 2 16 24 $3,647 <br />Quality of CBM Inter als, Local <br />Aquifers, and Surface Water <br />Task 7 - Identify Data 2 16 $1,840 <br />Insufficiencies and Devise Plan <br />to Fill Gaps <br />Task 8 - Collect Field Data 8 220 $22,747 <br />(Water Levels, Water Samples, <br />Aquifer Tests) <br />Task 9 - Depletion Modeling 22 200 $32,878 <br />Task 10 - Report Preparation 20 60 40 40 $15,052 <br />Task I I - Public Meetings 16 40 $6,039 <br /> <br />Total Hours: 82 200 456 88 64 128 <br />Cost: $10,726 $30,000 S44,980 $8,680 $4,115 $9,637 $108,139
The URL can be used to link to this page
Your browser does not support the video tag.