Laserfiche WebLink
North Platte Basin Roundtable Meeting, 10.21.2008 <br />Jeff C: the project is about 70% complete. The headgate is in, 2/3 of the diversion <br />structure is in place, and the fill that was wallowed out from the erosion is filled in. The <br />step pools still need to be done. <br />Jeff is planning on doing a post-project presentation to the roundtable once everything is <br />complete. <br />Barb V: We had a discussion about requiring all of our WSRA projects to do reports and <br />updates during and after the project. I don't think we voted on it. <br />Discussion about reporting for WSRA, whether the roundtable should require it, no <br />voting action taken. <br />No other business. <br />Meeting Adjourned. <br />Next Meeting: Tuesday, December 2'd, 2008, 3-5pm, USFS Bldg.