Approved Water Supply Reserve Account Applications by the CWCB Board
<br />
<br />South Platte asin otal Re uest 303 800 2 8 82 2
<br />Chatfield Reallocation EISIFR (Metro BRT contributing $103,000) $27,000 $27,000
<br />Clear Creek Water BankinglHigh Altitude Storage $52,000 $52,000
<br />Ovid Reservoir Comprehensive Feasibility Study $176,000 $176,000
<br />Lower South Platte Wetland Initiative Phase I South Platte River, CO $278,476 $278,476
<br />Stage Discharge Data Loggers and Telemetry $48,800 $48,800
<br />Southwest asin otal Re uest 2 2 00 2 2 0 000 2 32 00
<br />Dry Gulch ReservoirlSan Juan Reservoir Land Acquisition $1,000,000 $1,000,000
<br />Goodman Point Water Association Pipeline Environmental Assessment $7,700 $7,700
<br />Goodman Point Phase 2 $20,000 $240,000 $240,000
<br />Jackson Gulch Reservoir Expansion Project $80,000 $80,000
<br />Bauer Lakes $40,000 $40,000
<br />La Plata West Rural Water Supply System $100,000 $1,000,000 $1,100,000
<br />Town of Sawpit - EngineeringlPlanning for Domestic Water System; Southwest Basin $25,000 $25,000
<br />ampa White reen asin otal Re uest 3 10 1 0 000 0 10
<br />Energy Development Water Needs Assessment (300,000 Joint Application see
<br />Colorado) $150,000 $150,000
<br />Morrison Creek Reservoir Feasibility Study $49,500 $49,500
<br />Agricultural Water Needs Assessment $201,410 $201,410
<br />Common Data Repository $106,600 $106,600
<br />Status of Technical Assistance Task Orders
<br />
<br />Ar ansas asin
<br />• Update the status of identified projects and processes (IP&Ps) from SWSI Consumptive tasks, as outlined, have been scoped and will be
<br />• Articulate implementation status of conservation and reuse programs completed by June 2008,
<br />• Evaluate potential opportunities for rotational fallowing andlor leasing
<br />agreements
<br />• Evaluate groundwater sources that were not included in SWSI Phase I,
<br />especially designated basins.
<br />• Examine the relationship between Colorado River Compact supplies, imports
<br />from the Colorado River Basin and exports of native water supplies from the
<br />basin,
<br />Colorado asin
<br />Energy Development Water Needs Assessment Scoping (Joint with Yampa A workplan was completed for this effort. The energy study is being
<br />Basin Roundtable) implemented through at Water Supply Reserve Account Grant.
<br />unnison asin
<br />• Basinwide -Review, refine, andlor confirm the estimate of current and future Technical work for this first task order will be completed by June
<br />water demands and supply for the smaller water providers 2008.
<br />• Basinwide -Review and refine the estimate of current and future rural
<br />domestic demands and supply
<br />• Basinwide -Identify vulnerabilities towater supply shortages for Gunnison
<br />Basin municipalities
<br />• Sub-basin Specific: Upper Gunnison -Review, refine, andlor confirm the
<br />estimate of future snowmaking demands in the Upper Gunnison
<br />etro asin
<br />• Analysis of where providers are looking at the same water as a future supply First draft at technical work for this first task order has been
<br />• Update of unappropriated water in the South Platte Basin completed. Consumptive tasks, as outlined, will be completed by
<br />• Impact of water administration changes on the availability of water June 2008.
<br />• Impact of reusable water not being available to downstream users
<br />• Status of Conservation
<br />• Status of IPPs
<br />4
<br />S ??j,?
<br />-? -?d
<br />.. ,? ? ?x{..:: 1
<br />?: . -
<br />{
<br />'r?''€?,
<br />['i ?l ? ?1?;'?1 ??
<br />?lf!''lft,.,.'C.'. i!:
<br />f?r?T?J?1.
<br />-7-
|