My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 Annual Report
CWCB
>
Interbasin Compact Committee
>
DayForward
>
08 Annual Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 11:53:31 AM
Creation date
11/19/2008 2:25:01 PM
Metadata
Fields
Template:
Interbasin Compact Committee
Title
2008 Annual Report
Date
11/1/2008
Interbasin CC - Doc Type
Annual Legislative Report
Document Relationships
IBCC_AnnualReport_2022
(Message)
Path:
\Interbasin Compact Committee\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
? ?e <br />? ?? <br />.,- ? ? _ <br />r Yi.. <br />ti. <br />.? <br />?? <br />r p: <br /><+?a? <br />?.:???? s.i?:?a??c? <br />I?[_11?L:1:, <br />Methodology Overview <br />Prioritization <br />Build Upon Attributes: The first step the Basin <br />Roundtables are taking in completing their <br />nonconsumptive needs assessments is building upon <br />the GIS information that was gathered during the <br />Statewide Water Supply Initiative Phase 2 (SWSI <br />Phase 2). The Basin Roundtables are suggesting <br />additional data that are specific to their basins be <br />added to the SWSI Phase 2 GIS database. <br />Establishing Priorities: The attributes gathered by <br />the roundtables will become the basis for <br />establishing priorities for the basins. Establishing <br />priorities will rely upon local input and knowledge. <br />The technical assistance team is providing GIS tools <br />to the Basin Roundtables as an initial starting point <br />for their priority setting. <br />Quantification <br />After priorities are set for their basins, the <br />roundtables will have to determine if and where <br />they would like to utilize quantification <br />methodologies. The technical assistance team can <br />assist the roundtables in developing site-specific <br />and watershed level quantification information. <br />Both of these methods will be piloted within the <br />next several months to provide further information <br />to the roundtables. <br />Schedule <br />The schedule for completing the majority of the <br />products for the nonconsumptive needs <br />assessments is shown in Figure 3 below. It is <br />anticipated that the Basin Roundtables will have <br />established priorities by June 2008. During the <br />remainder of 2008, the roundtables will be <br />reviewing information generated from the <br />quantification pilot studies and applying these <br />quantification strategies in their basins. Work on <br />site-specific quantification and the flow evaluation <br />tool will occur through 2009. <br />Nonconsumptive Needs Assessment <br />Products <br />Following are the anticipated products of the Basin <br />Roundtable Nonconsumptive Needs Assessments: <br />• A complete set of GIS coverages that represent <br />Colorado's important environmental and <br />recreational attributes. <br />• A map of prioritized areas and reaches, as <br />determined by the individual BRTs. <br />Generalized or "coarse"flow evaluation tools and <br />site-specific instream flow quantification <br />methodologies that will help BRTs understand <br />areas that might require more site-specific <br />investigation. <br />cuu? ?uu? <br />TASK a Q a a z a ? " a a a a z <br />-l??-l=?-?=-?=?-? l=? l ? l a ? ? ? <br />Priorities <br />Build Upon Attributes ? <br />Establish Priorities ? ? ?_ ?, <br />Quantification <br />Where to Quantify? <br />Site-Specific Quantification <br />Flow Evaluation Tool ? ?. ? _ - - -- - LI, I I= <br />Implementation - - ? <br /> Figure 3 <br /> Schedule <br /> -4-
The URL can be used to link to this page
Your browser does not support the video tag.