Laserfiche WebLink
Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br />Task 7. Design - Once the master plan is completed and approved. design of facilities will cormnence <br />based on the order of construction determined in the master plan. Some facilities will be designed as part of <br />pre-construction (e.g. river diversions, treatment plant, initial pipelines and tanks) but most of the pipelines <br />and tanks will be designed as part of the construction phase. <br />4. If the Contracting Entity- is different then the Applicant (Project Sponsor or Owner) please describe the <br />Contracting Entity here. <br />N/A <br />Part B. - Description of the Water Activity - Please Refer to Criteria and Guidance Document for Eligibly Requirements <br />1. Name of water activity/project: <br />La Plata Archuleta Water District <br />What is the purpose of this grant application? <br />........................ <br />Environmental compliance and feasibility study <br />X Technical Assistance regarding permitting, feasibility studies, and environmental compliance <br />x Studies or analysis of structural, nonstructural, consumptive, nonconsumptive water needs, projects <br />Studv or Analvsis of <br />................. <br />x Structural project or activity <br />Nonstructural project or activity <br />Consumptive project or activity <br />Nonconsumptive project or activity <br />............................ <br />Structural and/ or nonstructural water project or activity