My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26e
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
26e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:53 PM
Creation date
11/13/2008 11:13:14 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2008
Description
CF Section - New Project Loans - Republican River Water Conservation District - North Fork Water Rights Lease
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Republican River Water Conservation District Agenda Item 26e <br />November 10 , 2008 <br />Page 3 of 7 <br /> <br />The three states agreed to settle the litigation on December 15, 2002 and the United States Supreme <br />Court adopted the final stipulation in 2003. As part of the settlement stipulation the states agreed to <br />use a commonly developed basin - wide groundwater model to quantify groundwater depletions to <br />river flows so groundwater use could be reflected in Compact A ccounting. Once the groundwater <br />depletions were considered in the accounting, Colorado's over all water use appeared to exceed its <br />compact entitlemen ts. <br /> <br />Ground water impacts from wells in Colorado included in the Compact Accounting averaged <br />approximately 25, 00 0 AF/yr over the period 2002 - 2006. These impacts are primarily due to ground <br />water diversions that occurred decades ago. Starting in 2003, Co lorado has exceeded its compact <br />allocations by an average of 11, 00 0 AF/yr . Some reduction in the amount that Colorado has <br />exceeded its compact allocations is expected in the future as the result of irrigated acreage <br />retirement programs. However, it is proj ected that the deficit will increase gradually to 15,000 AF <br />in 2039. <br /> <br />In January 2008, the Republican District received approval of a $60 million loan from the CWCB <br />to finance part of the proposed $71 million C ompact Compliance P ipeline Project to help add ress <br />th e situation . The expected yield of the Pipeline is 15,000 AF/yr , which should be adequate to <br />ensure compact compliance for the 2 0 - year period of repayment of the Compact Compliance <br />Pipeline l oan. <br /> <br />Pioneer/Laird Ditch Litigation <br /> <br />As early as the 19 of the Republican River surface water users believed that the <br />designated NHP Basin wells were causing injury to their senior surface rights, however they were <br />unsuccessful in their early legal efforts to remedy their perceived injury . <br /> <br />Base d on the 2003 C ompact settlement, the North Fork surface users asked the State Engineer to <br />curtail NHP Basin well pumping in order to protect their surface water rights. The State Engineer <br />forwarded the request to the Colorado Groundwater Commission and t he Commission dismissed <br />the case. O n July 1, 2005, the North Fork surface users filed a Petition for Hearing and Appeal of <br />State Engineer Action (Case No. 05 - GW - 14). <br /> <br />The petition sought among other things to re - draw the boundaries of the NHP Basin. If th e <br />settlement is not concluded and the surface owners prevail, the litigation could result in the <br />curtailment of 1,338 irrigation wells (plus commercial and municipal wells) in Yuma County. The <br />area impacted by the lawsuits new designated basin boundary is approx. 190,000 acres of highly <br />productive agriculture and several municipal wells. The curtailment of wells would have a severe <br />impact on the local economy as identified in an Economic Development Report prepared by James <br />Pritchett, Department of Agricult ural and Resource Economics at Colorado State University. The <br />study indicates an economic impact of $170 million in the first year of well curtailment. This will <br />B <br />loan for the Compact Compliance Pipeline, wh ich was approved by the CWCB in January 2008 <br />(HB 1346). <br /> <br />Just prior to the June 2008 Petition H earing , the Yuma County Water Authority and the surface <br />right owners agreed to a settlement by which the Republican would lease the <br />
The URL can be used to link to this page
Your browser does not support the video tag.