My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26d
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
26d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:53 PM
Creation date
11/13/2008 10:58:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2008
Description
CF Section - New Project Loans - Yuma County Water Authority Public Improvement District - North Fork Water Rights Purchase
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Yuma County Water Authority Public Improvement District Agenda Item 26d <br />November 10 , 2008 <br />Page 5 of 7 <br /> <br />North Fork Water Rights <br /> <br />Structure Decreed <br />Diversion <br /> 4 cfs <br />Laird Ditch 12 cfs <br />Pioneer Ditch 15 cfs <br /> 2 cfs <br />Holy Joe Canal & Reservoir 1 cfs <br />Pierce Miller Ditch 2.5 cfs <br />F D Johnson Ditch 4 cfs <br />Wiley No. 1 1.5 cfs <br />Wiley Spring 1 cfs <br /> <br />The Republican District has leased a portion of the w ater r ights in 2008, which demonstrated the <br />value of leasing such water to reduce the consumptive use charged to Colorado under the <br />Repub <br /> <br />Project Description <br /> <br />The Yuma County Water Authority reviewed the pending lawsuit which seeks to redraw the <br />boundaries of the NHP Basin and may result in the curtailment of 1,338 irrigation well s (plus <br />commercial and municipal wells) in Yuma County and studied the following alternatives: <br /> <br />Alternative 1 Litigate Dispute: Both parties to the litigation were confident that they would <br />prevail in the June 2008 hearing before the Groundwater Commiss ion. It should be noted that both <br />sides were equally confident prior to the District court appeal that lead to the hearing. At the <br />District Court level both sides won some arguments and lost some arguments. The Yuma County <br />PID expected that the parties w ould experience this same level of success as the litigation <br />continued. Unless the NHP Basin groundwater users were completely successful there was a <br />likelihood of curtailment of 300 to 1,300 wells. Case No. 05 - GW - 14 was set for a month long <br />hearing in Ju ne 2008 in front of a hearing officer for the Groundwater Commission . The Yuma <br />County PID estimated that it may take 4 to 10 years for a final conclusion to the dispute and cost <br />between $3 to $8 million for attorney and engineering fees. It was unlikely th at litigation would <br />eliminate the need to mitigate impacts to the surface water users. <br /> <br />: <br />Alternative 2 - Buy out the Water Rights (S ELECTED ) The North Fork surface users initially <br />sought more than $40 million for their water rights, but after a year of negotiations settled for $20 <br />million. The 2003 - 2007 average compact depletion charged to these rights was 2 , 578 AF/yr for the <br />irrigation of 1 , 000 to 1 , 500 acres. This alternative prevents further litigation concerning a dispute <br />lasting more than 30 years and threatening curtailment of the water supply to 190,000 irrigated <br />acres. Coupled with the compact compliance pipeline, this purchase secures the irrigation , <br />municipal , and commercial water suppl ies for the NHP Basin for many years. In addition, the wate r <br />can be relied upon by Yuma County cities as an emergency augmentation supply in the event that <br />compact compliance efforts fail and municipal wells are curtailed per the North Fork Lease . The <br />purchase contract also includes a dry up covenants from the sel lers. There may be additional <br />engineering and legal costs to complete the purchase but these are expected to be small and will be <br />covered by sources other than the CWCB loan . <br />
The URL can be used to link to this page
Your browser does not support the video tag.