My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26c
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
26c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:52 PM
Creation date
11/13/2008 10:56:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2008
Description
CF Section - New Project Loans - Weldon Valley Ditch Company - Cottonwood Draw Flume
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Project Loan Program - Project Data <br />Borrower: County <br />Weldon Valley Ditch Company : Morgan <br />Project Name: Project Type: <br />Cottonwood Draw Flume Ditch Rehabilitation <br />Drainage Basin: Water Source: <br />South Platte South Platte River <br />Total Project Cost: Funding Sources: <br />$150,000 CWCB, Company <br />Type of Borrower: Average Diversion: <br />Agricultural/Low-Income 36,000 acre-feet <br /> Municipal <br />CWCB Loan: Interest Rate: Term: <br />$136,350 (Including 1% fee) 2.6% 30 years <br />The Weldon Valley Ditch Company (Company) owns and operates the Weldon Valley Ditch. It <br />services approximately 6,400 acres ranging from two miles west of Orchard to three miles east of <br />Weldona. The Company’s major facilities include a bl adder dam diversion at the South Platte River, <br />a flume crossing at the Jackson Lake outlet, a fl ume crossing at the Cottonwood Draw, and a return <br />flume at the terminus of the ditch. The Cottonwood Draw flume is the subject of this loan request. <br />The flume is a wooden and steel st ructure built in 1965. It is nearing the end of its useful life and <br />needs to be replaced. Additionally, it spans a natu ral drainage area and is thereby threatened by <br />floods. The Company plans to replace the flume with a concrete siphon. Final de sign is expected to <br />be complete in January of 2009; construction is set to follow immediately with completion estimated <br />in February of 2009. <br />Jackson Reservoi r <br />Cottonwood Draw Flume <br />Weldon <br />Valle y Ditch <br />Weldona <br />Orchar d <br />Ft Morgan <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.