Laserfiche WebLink
<br /> <br /> <br />Discussion <br /> <br /> <br />As of November of this year, there is one authorization for funding contract that has been <br />extended beyond the three year deadline, but the sponsor is no longer interested in movi ng f orward <br />with the project . Staff has evaluated the authorization and disc ussed the status of the project with the <br />project sponsor. The result of this evaluation along with the sta ff recommendation is summarized as <br />follows : <br /> <br />Silt Water Conservancy Distri ct - Pump Pl ant Transformer Project (C150135 ) <br />1. <br />T he Silt Water Conservancy District operates a pump plant on the Colorado River to delive r <br />water to its Pump Canal, which serves agricultural users on the lower reaches of Silt Mesa. <br />The pump plant was built <br />existing pump plant transformer was scheduled to be replaced when upgrade s to Excel <br /> took place . Excel had planned to replace that line in <br />2004/2005, b ut have since inform ed the District that upgrades to the line would not occur for <br />a number of years. Based on that information, the District has elected not to pursue the <br />transformer replacement project and has requested by letter that CWCB de - authorize their <br />loan in the amount of $490,860 (letter attached) . <br /> <br />Recommendation <br /> <br /> Staff recomme nds the Board approve the de - authorization of the Silt Water Conservancy <br />District Pump Plant Transformer Proje ct Loan, C150135 , in the amount of $490,860. <br />2 <br /> <br />