My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25d
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
25d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:43 PM
Creation date
11/13/2008 10:48:38 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2008
Description
CF Section - Changes to Existing Loans - Silt Water Conservancy Dist. - Rehabilitation of System Infrastructure
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />The main cost overruns associated with the project w ere the re place ment of the Grass Valle y Siphon <br />and the projected future cost for the seepage control project at Harvey Gap Reservoir. The siphon <br />replacement increased the project cost by approximately $ 775,000, including design and <br />construction contingencies. Removin g the cost for future motor and pump replacement at the <br />the overall project cost by $387,910, while adjusting the future <br />seepage control project at Harvey Gap Reservoir increased the overall project cost by approximately <br />$15 0,000. Therefore, given the cost adjustment described above, and the increased cost for <br />engineering, inspection, and construction contingencies, the overall project has increased by <br />approximately $540,000, for a total adjusted system project cost of $1,67 0,000. <br /> <br />The District is requestin g an increase of $485,103 to its cu rre nt loan authorization of $1,029,897 to <br />cover 90% of the total cost . The new total amended loan amount for the District w ould be <br />$ 1,515 ,000 at its original interest rate of 2.5% for 3 0 years. The new annual payment will be <br />$ 79,621 , which includes the 10% reserve requirement. The District current loan of $ 1,029,897 <br />has an annual pay ment of $ 54,127 . <br /> <br />Financial Analysis <br /> <br />A summary of the fi nancial aspects of the project are presented below in Table 2. <br /> <br />Table 2 . Financial Summary <br />Total Project Cost $ 1,670,000 <br />CWCB Loan Amount (90% of Project Cost and 1% Service Fee ) $ 1,515 ,000 <br />CWCB Loan Payment (Including 10% Reserve) $ 79,621 <br />Number of Landowner Accounts 3 5 5 <br />Annual Assessment pe r Account $150 <br />Project Water Available 10,355 AF <br />Current Project Water Assessment per AF $ 9.00 <br />Future Project Water Assessment per AF $ 11.00 <br />Annual Cost of Loan per acre - foot Project Water 10,355AF $7.69 <br /> <br /> <br />Creditworthiness : <br /> <br />The District has a 1963 repayment contract with the US Bureau of Reclamation with an annual <br />payment of $19,200, and an outs tanding loan balance of $249,600 . The District also has two <br />existing CWCB loans. The first was approved in January 2000, for improvements to its <br />diversion on the Colorado River, with an annual payment of $5,725 and an ou tstanding loan <br />balance of $83,570.95 . The second CWCB loan for $486,000 was approved in March of 2003 <br />for power upgrades to its pumping plant. The District , however, has requested that this loan be <br />de - authorized at the CWCB November 2008 Board Meeting. Payments on all the District s <br />loans have been made as agreed and the loans are current. <br /> <br /> <br /> <br /> <br /> <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.