Laserfiche WebLink
ÍÌßÌÛ ÑÚ <br /> <br />Ý ÑÔÑÎßÜÑ <br /> <br />úÎÑÎËÜÙÎæÜÉØËúÎÏÊØËÇÜÉÔÎÏûÎÜËÙ   <br /> <br />ùØÍÜËÉÐØÏÉÎ×ïÜÉÈËÜÑë ØÊÎÈËÚØÊ  <br />ïíïí ͸»®³¿² ͬ®»»¬ô α±³ éîï <br />Ü»²ª»®ô ݱ´±®¿¼± èðîðí <br />и±²»æ øíðí÷ èêê ó íììï <br />ÚßÈæ øíðí÷ èêê ó ììéì <br /> <br /> <br />Þ·´´ 第»® Ö®ò <br /> <br />Ù±ª»®²±® <br /> <br /> <br />Ø¿®®·­ Üò ͸»®³¿² <br /> <br />ÜÒÎ Û¨»½«¬·ª» <br />Ü·®»½¬±® <br /> <br /> <br />Ö»²²·º»® Ôò Ù·³¾»´ <br />TO: Colorado Water Conservation Board Members <br />ÝÉÝÞ Ü·®»½¬±® <br /> <br /> <br />Ü¿² ӽ߫´·ºº» <br />FROM: Tim Feehan, P.E., Project Manager <br />ÝÉÝÞ Ü»°«¬§ <br />Mike Serlet, P.E., Chief <br />Ü·®»½¬±® <br /> <br />Water Supply Planning and Finance Section <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DATE: November 5, 2008 <br /> <br />Agenda Item 25d , November 18 - 19 , 200 8 Board Meeting <br />SUBJECT: <br />Water Supply Pla nning and Finance Section Changes to Existing Loans <br /> Silt Water Conservancy Dist. Rehabilitation of System Infrastructure <br /> <br /> <br />Introduction <br /> <br /> <br />At the July 2003 board meeting, the Colorado Water Conservation Board (CWCB) approved a loan <br />to the Silt Water Co nservancy District (District ) in the amount of $1,029,897 from the Con struction <br />Fund. The loan was for the replace ment of the Grass Valley Siphon; seepage control at Harve y <br />Gap Reservoir, repair of the stilling basin at Rifle Gap Re servoir; and the repla ce ment of the pumps <br />and motors at . <br /> <br />The District is requesting an increase of $ 485,103 to the Distr 2003 authorization of $1,029,897 . <br />The requested loan incre ase is due to the increased cost for the replacement of the Gr ass Valley <br />Siphon. <br /> <br />Staff Recommendation <br /> <br />Staff recommends that the Board approve an increase of $ 485,103 ($480,300 for project costs <br />and $4,803 for a 1% Loan Service Fee) to the District from the Construction Fun d Account at its <br />current interest rate of 2 .5 % for 30 years. <br />$1,515,000 ($1,500 , 000 for project costs and $15,000 for a 1% Loan Service Fee) for the <br />. Security for the loan shall be collateral in <br />compliance with CWCB Loan Policy No. 5. <br /> <br /> <br /> <br /> <br />1 <br />