My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11d (2)
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
1-1000
>
11d (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:34:35 PM
Creation date
11/13/2008 9:38:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/18/2008
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
report was released in connection with the Governor's Conference on Managing Drought and Climate <br />Risk and was passed out to conference attendees. Copies of the report can be downloaded from the <br />CWCB website at: http://cwcb.state.co.us/Home/ClimateChange/ClimateChangeCOReport.htm. (Ben <br />Wade) <br />REQUESTS FOR ADMINISTRATION OF ISF WATER RIGHTS: Staff, on behalf of the <br />Board, placed calls for administration of the following ISF water rights. Staff was alerted to low flow <br />conditions via the flow alert system. The Division Engineers have worked diligently to enforce the calls <br />through the curtailment of junior rights and/or through the implementation of various augmentation plans. <br />Stream ISF Case <br /> Date of Call Administration results: <br />Name Number <br /> The water commissioner curtailed three <br /> Multiple ditches and three unadjudicated ponds. In <br />Hunter Creek acquired September 5, 2008 addition, four decreed ponds were <br /> rights. administered per augmentation plans. The net <br /> gain to the stream was approximately 1.25cfs. <br />San Miguel Flows increased naturally as a result of a <br /> <br />River 4- 2 2 <br />0 CW 77 m r l 2 <br />Septe be 0, 008 <br />rain/snow event within a day of the call. <br /> The water commissioner required Upper <br /> Gunnison River WCD to make augmentation <br /> releases from Long Lake. In addition, 5 small <br />Slate River 4-80CW092 October 3, 2008 <br /> augmentation ponds released water to the <br /> Slate and a number of irrigation rights were <br /> curtailed on October 3 Otis <br /> 5-76W2950 The water commissioner curtailed 7 onds and <br />p <br />Roaring Fork <br />Ri r <br />ve 5-76W2949 September 2, 2008 10 ditches on the Roaring Fork River for a net <br /> gain of approximately 6 cfs. <br /> 5-76W2948 <br /> The Division Engineer had questions <br /> regarding the accuracy of the gage data upon <br /> which the call was based. Subsequent <br /> 6-77W1331 measurements by the USGS indicated that a <br />Elk River Au ust 29 2008 <br />g ~ shift was necessar and flows were hi her <br />y g <br /> 6-77W 1279 than previously indicated. The flows never <br /> dropped below the Board's 65cfs ISF right. <br /> As a result, administration was unnecessary. <br />The call letters and detailed information on the Board's rights that were administered can be found on the <br />CWCB's web page at: http://cwcb.state.co.us/StreamAndLake/Physical/AdministrativeCalls/ (Jeff <br />Baessler) <br />~u 26 <br />~~ <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.