My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 (5)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
08 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:33:44 PM
Creation date
11/13/2008 9:26:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/18/2008
Description
IWMD Section - Alternative Agricultural Water Transfer Methods Grant Program
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alternative Agricultural Water Transf er Methods – Grant and Loan Program <br />Project Summary Sheet <br />Applicant: <br />CSU—Southern Regional Extension Office <br />Water Activity Name: <br /> The Effect of Land Fallowing and Water Rights Leasing on <br />Corn Yield, Nutrient Needs and Economics in the Lower Arkansas River Valley of <br />Colorado <br />Amount Requested: <br /> $110,883 <br />Matching Funds <br />: Yes ($12,320) <br />Drainage Basin: <br /> Arkansas River <br />Water Source: <br /> Arkansas River <br />Project Summary: <br />This project is intended for two purposes. First, it will evaluate the technical (i.e., <br />economic, biophysical, and management) issues involved in maintaining or improving <br />yields on fallowed lands when they are put back into produc tion after the lease <br />arrangement ends. Secondly, it will provide a logistical anal ysis regarding the <br />practicability of coordinating these arrangements with a broker (likely the Super Ditch <br />Company), and also canal companies possessing both senior and junior water rights in the <br />Valley. With respect to the funding program goals, the proposed project will provide <br />usable and transferable information that wi ll increase statewide understanding of how to <br />continue farming within the context of leas e arrangements, thereby sustaining meaningful <br />production agriculture. Leasing strategies being advanced in the Valley are intended to <br />avoid permanent retirement and blighting of productive farmland. Water rights leasing <br />promotes the fallowing of land from irrigation for a prescribed number of years or on an <br />interruptible basis, in order to supply water to municipal a nd industrial (M & I) interests. <br />In the minds of farmers who are unfamiliar with the concept, however, water leasing <br />strategies raise key questions about: 1) the extent to which this strategy can help sustain <br />farming operations economically; 2) the biophysical impacts (e.g., soil quality) on <br />farmland during fallowing, and how these impacts may affect future cr op yields, and; 3) <br />the required costs and management associat ed with bringing land back into production <br />after it has been fallowed. These questions must be answered to inform irrigators of the <br />lease value of their water rights. Actual and ongoing demonstrations of water transfer, as <br />proposed in this project, w ill address an information gap regarding the economic value <br />and practicability of water leasing, as ultimat ely required to maintain profitable farming <br />operations. <br />The results of these demonstrations w ill also allow CSU Extension to provide <br />recommendations on land fallowing and re turning fallowed land back to production. <br />These recommendations are needed because of the expectation that farming will continue <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.