My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 (4)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
06 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:33:22 PM
Creation date
11/12/2008 3:13:41 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/18/2008
Description
ISF Section - Instream Flow Rules Revision
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ISF Rule 8i.(3) Injury W ith Mitigation Nov ember 10 , 2008 Draft <br />( No c hanges to September 2008 d raft) <br /> <br /> <br />the mitigation are located to inspect the structures at <br />certain time intervals, and, if necessary, to perform <br />biological stream monitoring. This provision shall <br />clearly define the reasonable nature, extent and <br />timing of such access (i.e, advance notice, dates, <br />times or season of access, coordination with <br />proponent, and loc ation and routes of access) ; <br />ÔÇ A term providing that if the proponent ceases to <br />provide the agreed upon mitigation (such as <br />removing structural components or failing to <br />maintain them to a specified level, or ceasing to <br />implement non - structural components), t hat the <br />proponent will not divert water or take any other <br />action that would reduce flows in the affected <br />stream below the decreed ISF amount because the <br />Board w ill no longer accept the injury based upon <br />the mitigation no longer being in effect (in such <br />cas e, if the Board places a call for the affected ISF <br />water right, the Board will notify the Division <br />Engineer that this provision of the decree now is in <br />effect and that the Board is not accepting the <br />injury) ; <br />Ø Ç A requirement that the proponent install ÜÏÙÍÜÄ <br /> <br />ÎÍØËÜÉÔÎÏÜÏÙÐÜÔÏÉØÏÜÏÚØÚÎÊÉÊÎ× (or commit to <br />pay operation and maintenance costs if the CWCB <br />installs) any measuring devices deemed necessary <br />by the Division Engineer to administer the terms of <br />the stipulation and decree implementing the Injury <br />with Mitigation pretrial resolution. <br />ÇÔ A term providing that the water court will retain <br />jurisdiction to enforce the terms and conditions set <br />forth above in subsections (a) ( e), and any other <br />terms and conditions specific to the injury with <br />mitigation pretrial re solution , as a water matter. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.