Laserfiche WebLink
ISF Rule 6 Water Acquisitions November 1 0 , 2008 Draft <br />(Changes to September 2008 Draft shown in bold) <br />4) determine the method by which the historical consumptiv e use should <br /> <br />be quantified and credited during the term of the agreement for the <br />pursuant to section 37 - 92 - 102(3), <br />lease or loan of the water right <br />C.R.S <br />. êÜÔÙÐØÉÕÎÙÊÕÜÑÑËØÚÎÖÏÔÃØÉÕØÜÚÉÈÜÑÜÐÎÈÏÉÎ×ÚÎÏÊÈÐÍÉÔÇØ <br />ÈÊØÜÇÜÔÑÜÛÑØÈÏÙØËÉÕØ ÑØÜÊØÙÎËÑÎÜÏØÙ  ÆÜÉØËËÔÖÕÉÜÏÙ  ÊÕÜÑÑÏÎÉËØÊÈÑÉ <br />ÔÏ  Ü  ËØÙÈÚÉÔÎÏÎ×  ÉÕØÕÔÊÉÎËÔÚÜÑÚÎÏÊÈÐÍÉÔÇØÈÊØ  Î×ÉÕÜÉÆÜÉØËËÔÖÕÉ <br />ÙÈËÔÏÖÉÕØÉØËÐÎ×ÉÕØÑØÜÊØÎËÑÎÜÏØÅÚØÍÉÉÎÉÕØØÅÉØÏÉÊÈÚÕËØÙÈÚÉÔÎÏ <br />ÔÊÛÜÊØÙÈÍÎÏÉÕØÜÚÉÈÜÑÜÐÎÈÏÉÎׯÜÉØËÜÇÜÔÑÜÛÑØÈÏÙØËÊÜÔÙ  ËÔÖÕÉÊ  <br /> <br />6f. 6j. Limitat ion on Acquisitions . The Board may not accept a donation of <br />water rights that were acquired by condemnation, or a donation of water <br />rights that would require the removal of existing infrastructure without <br />approval of the current owner of such infrastructu re , or a donation of <br />water rights that were acquired by condemnation . <br /> <br />6g. 6k. Temporary Loans of Water to the Board . The Board may accept <br />temporary <br />loans of water for instream flow use for a period not to exceed <br />120 days in any one year, in accordance with the p rocedures and subject to <br />the limitations set forth in section 37 - 83 - 105, C.R.S. <br /> <br /> temporary <br />(1) Within 5 working days after receiving an offer of a <br />loan of water to the Board for temporary instream flow use, the Director <br />will provide a response to the pro ponent and, unless the proposed loan has <br />no potential value for instream flow use , staff will coordinate with the <br />proponent on preparing and submitting the necessary documentation to the <br />State and Division Engineers required by sections 37 - 83 - 105(2)(a)(I) and <br />(2)(b)(I), C.R.S., and providing the public notice required by section 37 - <br />83 - 105(2)(b)(II), C.R.S. <br /> <br />2) (2) Provided that the State Engineer has made a determination <br />of no injury pursuant to section 37 - 83 - 105(2)(a)(III), C.R.S., the Board <br />temporary <br />hereby delegates authority to the CWCB Director to accept <br />loans of water for instream flow use in accordance with the procedures <br />and subject to the limitations set forth in section 37 - 83 - 105 and to take any <br />administrative action necessary to put the loaned water to instream flow <br />use. In subsequent years, and p <br /> <br />3) P - injury is <br />still in effect, the Director shall notify the proponent and the State <br />temporary <br />Engineer whether the loan is to be exercised in subsequent <br />years . Such notification shall be provided within 5 working days of the <br />Director being notified by the proponent that the water is available for use <br />temporary <br />under the loan. <br />decreed instream flow amount or <br />extend beyond the <br />during the loan term, and shall comply with any terms and conditions <br />5 <br />