My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02148
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:14:48 AM
Creation date
11/11/2008 11:25:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153788
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
3
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,+ 4 ~ <br />Plan of Study -Greeley and Loveland Irrigation System Rehabilitation Feasibility Study Page 7 <br />ESTIMATED COST <br />The summary of the estimated task costs are shown in the following table: <br />Task No. Description Estimated <br /> Cost <br />1 Data Collection $8,120 <br />2 Hydrologic Analysis 4,560 <br />3 Existing Facilities Evaluation 7,120 <br />4 Alternative Development 19,240 <br />5 Alternative Evaluation <br />~ 8,120 <br />6 Financial Analysis 2,048 <br />7 Study Report 7,720 <br />8 Coordination Meetings 3,120 <br /> Subtotal Salary Costs $60,048 <br /> Subtotal Direct Costs <br /> (Telephone, Reproduction, Mileage, Postage, Soflwaze - CanalMan $1,725 <br /> (Client Copy)) <br /> Subconsultants <br /> Surv~g $3,000 <br /> Environmental -ERO $2,000 <br /> TOTAL PROJECT COST $66,773 <br />F:(PROJECTS\GREELF.~-1\CWCB\GRELOV.PRO <br />
The URL can be used to link to this page
Your browser does not support the video tag.