Laserfiche WebLink
Plan of Study -Greeley and Loveland Irrigation System Rehabilitation Feasibility Study Page Z <br />DETAILED WORK TASK5 <br />The following POS is based on eight major activities. Each will result in the prepazation of one or more <br />deliverables which will be submitted for review and approval in accordance with the attached schedule. The task <br />descriptions are arranged inthe order of their performance with the exception of Task 8 Coordination Meetings. <br />It is anticipated that project meetings will be held once a month. A summary of the deliverables for the Greeley <br />and Loveland Irrigation System Rehabilitation Feasibility Study aze shown in the following table: <br />Task No. Description Product <br />Data Collection <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />H drolo 'c Anal sis <br />Y ~ Y <br />Existing Facilities Evu <br />Alternative Development <br />Alternative Evaluation <br />Financial Analysis <br />Study Report <br />Coordination Meetings <br />Memorandum, <br />Existing Facilities Inventory <br />Memorandum <br />Memorandum, <br />DSS Hydraulic Model <br />Memorandum <br />Memorandum <br />Memorandum <br />Report <br />Progress Reports <br />Task 1-Data Collection <br />Objective: <br />A thorough knowledge of previous studies will be augmented with published physical information, environmental <br />and water rights issues. The published physical information will include construction drawings of the existing <br />facilities (e.g. reservoirs, canals, turnouts, etc.). An understanding of the environmental and water rights issues <br />will be developed by reseazching available information. <br />Methodology: <br />1. A two-day field investigation will be made to develop an understanding of the project layout and <br />operations. Photographs will betaken during the field survey to add in the development of the exiting <br />facilities inventory. <br />2. An existing facilities inventory will be prepared. The inventory will describe the physical location, <br />condition and hydraulic properties of the structures. <br />3. Available water rights information from the Company will be reviewed and tabulated. <br />4. Existingtwo-foot contour maps will be obtained from the City of Loveland. Survey spot checks will be <br />identified during the field investigation associated with flow structures. <br />F:\PROJECTS\GREELE-1\C W CB\GRELOV.PRO <br />