My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02145
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:53 AM
Creation date
11/11/2008 11:25:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153382
Contractor Name
Fruita, City of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCHEDULE A <br />COLORADO WATER CONS[RVATION BOARD <br />CUNSTRUCiION FUNU PRUCRAM PROCEDURES <br />1. Board approval oP engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />ceservolrs must also be approved by State Engineer's <br />office). <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br />5. Project sponsor may issue the notice of aMard and the <br />notice to proceed with construction to the contractor <br />(both notices must be ao-~the Board staff before <br />they are i ssued) . ,,J~~~ <br />6. Conduct a pre-constru n n Approval of <br />construction schedul~B~~f1 <br />7. Construction commences. The Board staPP makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction an change 1Lems can commence. Emergency <br />items cleared by telephone. <br />B. The consulting engineer certifies that the project has <br />been completed according to approved drawings and <br />specifications and arranges for final inspection. <br />9. Final inspection and acceptance of as-built project by <br />Board Staff, <br />i <br />10. Submittal of as-built drawings co Board staff for <br />approval and filing. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.