My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3rd Qrt 08 Newsletter
CWCB
>
IBCC Process Program Material
>
DayForward
>
3rd Qrt 08 Newsletter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:06:00 PM
Creation date
11/6/2008 4:47:11 PM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Interbasin Compact Process Quarterly Newsletter 3Q 2008
Date
11/1/2008
IBCC - Doc Type
Fact Sheets & Quarterly Newsletters
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task Order U date <br />~ <br />House Bill 05-1177 requires each Basin Roundtable <br />to develop a basin-wide water needs assessment <br />consisting of: <br />~ Consumptive needs <br />~ Nonconsumptive needs <br />~ Water supply availability <br />~ Propose projects or methods to meet water <br />needs <br />The following table describes the status of each <br />roundtable with respect to completing their needs <br />assessments. At this time, no roundtable has pro- <br />posed projects or methods to meet their water <br />needs. CWCB is in the process of developing de- <br />mands to 2050 and updating identified projects and <br />processes statewide. <br />Status of Basin Roundtable Needs Assessments <br /> <br />Arkansas • Used SWSI 1 as baseline needs ~ Developed priority mapping ~ Used SWSI 1 as baseline <br /> assessment • Participating in pilot of watershed flow ~ Assume no additional water <br /> • Updated SWSI 1 Identified Projects evaluation tool availability <br /> and Processes • Identifying areas to quantify <br /> nonconsumptive needs <br />Colorado • Used SWSI 1 and UPCO as ~ Developed priority mapping and matrix ~ Participating in Colorado River <br /> baseline needs assessment • Participating in pilot of watershed flow Supply Availability Study <br /> • Developed energy water needs evaluation tool and site-specific <br /> work plan and implementing under quantification methods <br /> WSRA <br />Gunnison • Used SWSI 1 as baseline needs ~ Developed preliminary priority ~ Participating in Colorado River <br /> assessment mapping Supply Availability Study <br /> • Revised basinwide demands, <br /> identified vulnerabilities, and <br /> updated snowmaking demands <br /> • Developed work plan for WSRA <br /> grant to examine ag shortages <br />Metro • Used SWSI 1 as baseline needs ~ Developed preliminary priority ~ Used SWSI 1 as baseline needs <br /> assessment mapping assessment <br /> • Analysis of completing supplies, ~ Assume no additional water <br /> examine unappropriated water, availability <br /> discussion of river appropriation, <br /> examination of conservation plans <br />North Platte • Used SWSI 1 as baseline needs ~ Developed preliminary priority ~ CWCB is assisting in supply <br /> assessment mapping availability modeling through DSS <br />Rio Grande • Used SWSI 1 as baseline needs ~ Developed preliminary priority ~ Groundwater study conducted <br /> assessment mapping <br /> • Conducted groundwater level study <br />South Platte • Used SWSI 1 as baseline needs ~ Developed preliminary priority ~ Used SWSI 1 as baseline needs <br /> assessment mapping assessment <br /> • Analysis of completing supplies, ~ Examination of unappropriated water <br /> examine unappropriated water, found little to no water availability <br /> discussion of river appropriation, <br /> examination of conservation plans <br />Southwest • Used SWSI 1 as baseline needs ~ Developed preliminary priority ~ Participating in Colorado River <br /> assessment mapping Supply Availability Study <br />YampalWhite • Used SWSI 1 as baseline needs ~ Developed preliminary priority ~ Participating in Colorado River <br /> assessment mapping Supply Availability Study <br /> • Developed energy water needs <br /> work plan and implementing under <br /> WSRA <br />^~t~; { t i <br />-~~ - ~~,~ <br />c `' J <br />~ ' z <br />~ <br />~ ~ <br />. c~ > ~ ~ <br />` _.. ~ 6 <br />#p'I'ii:) .8 4 <br />ct~~c~a~rac~ <br />~~ <br />V?F:l'Al~ l~°/~ N l' C)F <br />~JATURAL <br />l~s~vzic~s <br />
The URL can be used to link to this page
Your browser does not support the video tag.