My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRWAS_Phase1 Scope Final
CWCB
>
Decision Support Systems
>
DayForward
>
CRWAS_Phase1 Scope Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 10:21:34 AM
Creation date
10/16/2008 8:58:56 AM
Metadata
Fields
Template:
Decision Support Systems
Title
CRWAS - Water Availability Study of the Colorado River and Tributaries - Phase 1 Scope of Work
Description
Scope of Work for Colorado River Water Availability Study
Decision Support - Doc Type
Scope of Work
Date
8/1/2008
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C154124
Bill Number
SB07-122, HB08-1346
Prepared By
Boyle Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phase I will help the State address the following questions: <br />• What is a reasonable base of existing uses (by amount and location} to utilize in the Colorado <br />River Water Availability Study? <br />• How does historical hydrology in the last 70-90 years compare to a longer hydrologic trace <br />developed based on tree rings analysis? <br />• What is a reasonable projection for hydrology as affected by climate change? <br />• Based an evaluations of previous investigations of Colorado River Compact entitlements and <br />considering, through Phase I model application, current information, how much water would <br />Colorado be entitled to under the Compacts? <br />Phase I will be conducted simultaneously with the water needs assessments being prepared by <br />the following BRT subgroups: 1) Consumptive Water Needs Group and 2) Non-Consumptive <br />Water Needs Group. The results of the Phase 1 Study will be supplemented by these needs <br />assessments to formulate water demand alternatives for Phase II. <br />The Study will be conducted with close coordination between the consulting team and the <br />CWCB management team through monthly coordination meetings and through submittal of <br />interim, draft and final work products as defined below in the task descriptions. The goal will be <br />to strike a balance between enough formal submittals to assure good communication of technical <br />details without unduly imposing an the CWCB management team's review time. Progress <br />meetings will focus on recent work, upcoming work, and potential scope and budget concerns to <br />allow timely decisions if adjustments need to be made. Progress reports will accompany <br />monthly invoices. They will itemize the work performed during the billing period and also <br />summarize concerns, if any, with upcoming work and budget needs. <br />Draft work products will be submitted in MS Word format to facilitate review and editing. Final <br />work products will be submitted in MS Woxd and in PDF formats. Basin maps prepared in GIS <br />will be submitted with shape files and in PDF format. It is anticipated that all work products <br />posted an the State's websites will be in PDF format. Memos prepared to summarize technical <br />analyses for the review by the CWCB and others involved in the Study shall include sections on; <br />1) background; 2) methodology and assumptions and 3) results. <br />The Phase I Scope of Work is comprised of the following tasks: <br />Phase I Tasks <br />Task Subtask Task Title <br />1 Project Management <br /> 1.1 Start-u ,Coordination, and Re ortin <br /> 1.2 IBCCBRT Meetin s <br /> I.3 Public Information <br /> 1.4 Phase II Sco in <br />2 Literature Review <br /> 2.1 Pertinent Document List <br />Colorado River water Aaaiiabiiity Study Scope 2 R128/2D08 <br />CRWAS Phasel Contract Scope EX A Fina] <br />
The URL can be used to link to this page
Your browser does not support the video tag.