My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16c (2)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
16c (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:35:58 PM
Creation date
10/16/2008 8:57:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/22/2008
Description
CF Section - New Project Loans - San Luis Valley Water Conservancy District - Water Rights Acquisition
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Project Loan Program - Project Data <br />Borrower: County <br />San Luis Valley Water Conservancy District : Alamosa <br />Project Name: Project Type: <br />Water Rights Acquisition Water Rights <br />Drainage Basin: Water Source: <br />Rio Grande Rio Los Pinos <br />Total Project Cost: Funding Sources: <br />$800,000 CWCB, District <br />Type of Borrower: Average Delivery: <br />Municipal Low Income 141 acre-feet <br />CWCB Loan: Interest Rate: Term: <br />$727,200 (Including 1% fee) 3.5% 30 years <br />The San Luis Valley Water Conservancy District (District) operates an augmentation program <br />servicing portions of Rio Grande, Alamosa, Saguache, Hinsdale and Mineral Counties. The <br />augmentation program was developed to offset rive r depletions from wells serving residential and <br />commercial uses in the area. The District intends to acquire additional wate r rights to add to its <br />existing program. It has a signed purchase agreemen t to buy a one-third intere st in the Pine River <br />Weminuche Pass Ditch (of which it already owns one ha lf interest). This new right equals 6 cfs and <br />is expected to yield approx. 141 AF annually. The purchase is expected to take place within 45-100 <br />days of the July 2008 CWCB Board Meeting. <br />Continental <br />Reservoir <br />Creede <br />Santa Maria <br />Reservoir <br />Rio Grande <br />River <br />Rio Grande <br />Reservoir <br />Weminuche <br />Pass Ditch <br />p <br />Location Ma <br />
The URL can be used to link to this page
Your browser does not support the video tag.