My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16a
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
16a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:35:56 PM
Creation date
10/16/2008 8:51:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/22/2008
Description
CF Section - New Project Loans - Loudon Irrigating Canal & Res. Co. - Rist Benton Res. Dam Rehab. Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax: (303) 866-4474 <br />www.cwcb.state.co.us <br />Bill Ritter, Jr. <br />Governor <br />TO: Colorado Water Conservation Board Members <br />Harris D. Sherman <br />DNR Executive Director <br />FROM: Anna Mauss, PE <br />Jennifer L. Gimbel <br />Mike Serlet, PE, Chief <br />CWCB Director <br />Water Supply Planning & Finance Section <br />Dan McAuliffe <br />CWCB Deputy Director <br />DATE: July 15, 2008 <br />Agenda Item 16a, July 22-23, 2008 Board Meeting <br />SUBJECT: <br /> Water Supply Planning and Finance Section – New Project Loans <br /> Louden Irrigating Canal and Reservoir Company – Rist Benson Reservoir Dam <br />Repair Project <br />Introduction <br />The Louden Irrigating Canal and Reservoir Comp any (Borrower) has requested a loan to complete the <br />Rist Benson Reservoir Dam Repair Project (Project). The Project involves re pairing a section of the <br />dam that has seepage problems. On ce completed, the repair will a llow for full storag e in the Rist <br />Benson Reservoir (Reservoir). See attached Proj ect Data Sheet for a location map and a project <br />summary. <br />Staff Recommendation <br />Staff recommends the Board approve a loan not to exceed $263,610 ($261,000 for project costs and <br />$2,610 for the 1% Loan Service Fee) to the Louden Irrigating Canal and Reservoir Company for the <br />Rist Benson Reservoir Dam Repair Project from the Severance Tax Trust Fund Perpetual Base <br />Account. The terms of the loan sh all be a 30-year loan at 3.5% pe r annum. Security for the loan <br />shall be in compliance with CWCB Financial Policy #5. <br />Water Supply Protection • Watershed Protection & Flood Mitigatio n • Stream & Lake Protection • Water Supply Planning & Finance <br />Water Conservation & Drought Planning • In trastate Water Management & Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.