My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13all
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
1-1000
>
13all
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:35:08 PM
Creation date
10/15/2008 4:30:13 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/22/2008
Description
ISF Section - Lower San Miguel Water Resources Planning Study
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
have been harmed by Umetco's operations (no water users have made any such claims to date). <br />The Consent Decree expressly provides that when the Remedial Action Plan is complete, the <br />Uravan Water Trust shall convey the Johnson Ditch water rights and the wells to the CWCB. <br />The Uravan Water Rights are described below: <br />Uravan Water Rights -San Miguel River <br />Name Amount Appropriation Date Adjudication Date Decreed <br /> (cfs) Uses <br />Johnson Ditch 3.80 4/10/1891 6/3/1911 Irrigation <br />Johnson Ditch 3.75 2/16/1903 6/3/1911 Irrigation <br />Johnson Ditch 26.2 2/16/1903 10/31/1911 Irrigation, <br /> Power <br /> Irrigation, <br />Johnson Ditch 16.8 7/21/1913 9/16/1920 <br /> Power <br />Miguel Power Company Canal~l~ 240 10122/1926~1~ 11I1I1939~i~ Power <br />Notes: (1) Appropriation and adjudication dates reflect State of Colorado water rights tabulation <br />Uravan Water Rights -Tributary Groundwater <br />Name Amount Appropriation Date Adjudication Date Decreed <br /> (cfs) Uses <br />Mineral Camp Nell 0.055 5/1/1958 12/31/1971 Domestic <br />Uravan No. 1 Nell 0.290 5/13/1959 12/31/1971 Domestic <br />Uravan No. 2 well 1.100 12/2/1959 12/31/1971 Domestic <br />Tabeguache well No. 1 0.440 7/23/1973 12/31/1973 Municipal, <br /> Industrial <br /> Municipal, <br />Tabeguache well No. 2 0.280 7/23/1973 12/31/1973 <br /> Industrial <br /> Industrial <br />Eula Belle Mine Well 0.031 1/15/1961 12/31/1971 , <br /> Domestic <br />In 1991, the CWCB entered into a Memorandum of Understanding with Montrose County and <br />the towns of Nucla and Naturita in which the CWCB agreed to consult with those entities <br />regarding the future use and disposition of the UMETCO water rights. Among other things, the <br />MOU also granted those entities a "first right of refusal" in the event the CWCB elected to sell or <br />dispose of the water rights. <br />In 2003, after an article appeared in a local newspaper regarding potential uses of the Uravan <br />Water Rights, representatives of the signatories to the MOU and various state officials met to <br />discuss the disposition of the Uravan Water Rights once the remediation was complete, to get an <br />estimate on the time schedule for completion of remediation, and to evaluate the status of the <br />Uravan Water Rights. Subsequent to that meeting, the CWCB hired Leonard Rice Engineers, <br />Inc. to conduct a study of the Uravan Water Rights, which was completed in June 2005. The <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.