My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Consent_2a (2)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
Consent_2a (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:39:00 PM
Creation date
10/15/2008 3:17:34 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/22/2008
Description
CF Section - Changes to Existing Loans - Granby Ditch and Reservoir Company - Granby #12 Dam Rehabilitation Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Granby Ditch and Reservoir Company Consent Agenda Item 2a <br />July 15, 2008 <br />Page 2 of 2 <br />contract condition. The CWCB standard cont ract requires a rate covenant to increa se assessments as <br />necessary, not immediat e rate increases. <br />In order to raise assessments prior to contracting, the Company would need to hold a special election. <br />Such an election would add additional expense to the Project. The Project is currently in the design <br />phase and is expected to be constructed between June and October of 2009. Given this schedule, it is <br />anticipated loan repayment would begin in October of 2010. The Company wo uld prefer to postpone <br />raising assessments until it is in the repayment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.