My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150261 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150261 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2014 4:23:53 PM
Creation date
10/13/2008 11:23:50 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150261
Contractor Name
Pagosa Area Water and Sanitation District
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t CWCB Construction Fund Loan Application <br />' 6. Will the acquisition of additional water rights be necessary? YES _ NO X <br />' The PAWSD and SJWCD already have adjudicated water storage and diversion rights for <br />the Dry Gulch Reservoir Project in Case Numbers 2004CW85 and 73-308D, District <br />Court, Water Division 7. <br />' 7. Please list the names, addresses and,phone numbers of the Applicant's en ig neer(s) and <br />attorne s). <br />' NAME ADDRESS and PHONE <br />Harris Water Engineering, Inc. 954 East 2nd Ave, Durango, CO 81301 <br />' Steve C. Harris, P.E. (970) 259-5322 <br />Collins, Cockrel and Cole, P.C. 390 Union Blvd, Suite 400, Denver, CO 80228 <br />' Evan D. Ela, Esq. (800) 354-5941 <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />' progress for the proposed project. Please submit one copy of each completed study with <br />this application. <br /> <br />A detailed Feasibility Study is provided in Attachment 7. Other studies in Attachment <br />7 include: <br />Alternative Reservoir Site Evaluation Appraisal Level Study. Harris Water Engineering, <br />Inc. 1989. <br />Appraisal Report to Evaluate Future Raw Water Demands and Water Supply Alternative <br />Plans. Harris Water Engineering, Inc. 2003. <br />Expert Opinion in Support of Water Court Case No. 04CW85, Water Division 7. Steven <br />C. Harris. 2005. <br />Estimated cost of the project. ~ ~,,~~~~D <br />Nm <br />Estimated Pre-Construction Costs. $ C~.S&4;600 (pre-construction studies) <br />Estimated Land Acquisition Costs: $18,300,000 (itemized below) <br />Weber Property Purchase Cost: ~lO.3 Z ~9.8'hlillion (with interest to closing) <br />Other Private Property Cost: Z .p Z $1.5 million(~,4./~'tY r~P.~ <br />USFS Land Exchange: ~illion ,wr- ,•rc , <br />Estimated Total Costs: <br />$24 ,000 <br />The distribution of estimated costs between the private land acquisition, USFS, and pre- <br />construction may change from the above amounts. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.