My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23b
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
23b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:31 PM
Creation date
10/2/2008 1:34:25 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/17/2008
Description
CF Section - New Project Loans - Farmers Pawnee Canal Company - Ditch Flow Control Structures Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Project Loan Program - Project Data <br />Borrower: County <br />Farmers Pawnee Canal Company : Logan <br />Project Name: Project Type: <br />Ditch Flow Control Structures Project Diversion Structures <br />Drainage Basin: Water Source: <br />South Platte South Platte River <br />Total Project Cost: Funding Sources: <br />$250,000 CWCB, Company <br />Type of Borrower: Average Diversion: <br />Agricultural 27,260 acre-feet <br />CWCB Loan: Interest Rate: Term: <br />$227,250 (Including 1% fee) 2.5% 30 years <br />The Farmers Pawnee Canal Compan y (Company) provides irrigation water to approximately 10,000 <br />acres of land between Merino and Sterling, Colorado. It uses two separate structures to control flow <br />in the Pawnee Ditch (Ditch). The first is a main di version at the South Platte River. The second is a <br />few miles down the Ditch and is us ed to adjust flow. The main diversion is a concrete rollover wall <br />with vents to allow flushing of sand when opened. The secondary structure is currently controlled <br />through the use of board style gates. Both stru ctures are labor intensive and require monthly <br />maintenance. To help with efficiency, the Co mpany plans on replacing a portion of the main <br />diversion with a new 12-foot radial gate. It also plans on replacing the boar d gates at the secondary <br />structure with four 8-foot wide ra dial gates. Construction is expect ed to take place in November of <br />2008. <br />Sterling <br />Pawnee Canal <br />Merino <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.