My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23b
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
23b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:31 PM
Creation date
10/2/2008 1:34:25 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/17/2008
Description
CF Section - New Project Loans - Farmers Pawnee Canal Company - Ditch Flow Control Structures Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Farmers Pawnee Canal Company Agenda Item 23b <br />September 9, 2008 <br />Page 3 of 5 <br />Project Description <br />A range of alternatives were considered by the Company, includi ng:1) rebuild components of the <br />secondary flow structure; 2) build a sand gate at the river diversion and rebuild the components of <br />the secondary flow control structur e; and 3) replace 100 feet of the river diversion structure with a <br />new bladder gate system and leave the secondary stru cture unchanged. <br /> – <br />Alternative 1 Rebuild the components of the se condary flow control structure: This alternative <br />involved replacing the board gates at the secondary flow control stru cture with new 8-foot radial <br />gates. Three gates would be requi red in the ditch and one in the ch annel back to the river. This <br />would address the efficiency issue but would not correct the sanding pr oblems at the river <br />diversion. The cost of this alterna tive is $105,000. <br />Alternative 2- Build sand gate at river diversi on and rebuild components of secondary flow control <br />structure: This alternative consisted of replacing a portion of the conc rete wall system in the river <br />channel with a new 12-foot radial gate. The ga te would reduce the sandb ar problem throughout the <br />year because sand could be flushed through the system . This alternative also consisted of replacing <br />board gates at the secondary flow control structure with new eight f oot radial gates. Three gates <br />would be required in the ditch and one in the cha nnel back to the river. This would correct the <br />efficiency problem and the sanding problem . The cost of this alternative is $250,000. <br />Alternative 3 – Replace 100 feet of the river diversion structure with new bladder gate system : This <br />alternative consisted of only replacing a portion of the river diversion. A 100- foot section of bladder <br />gate would replace part of the existing concrete wall system and the remaining structures would be <br />left intact. This alternative w ould only reduce the sandbar issues. Th e cost of this alternative is <br />$850,000. <br />Selected Alternative: The Company has chosen Alternative 2: <br />- 12-foot wide radial gate to replace a portion of the concrete wall system in the river <br />channel <br />- Sheet piling under the gate structure for stab ilization and protecti on from undercurrents <br />- Four 8-foot wide radial gates to replace th e board gates at the secondary flow control <br />structure <br />- <br />The Project design is expected to be completed by October 1, 2008. Construc tion is anticipated to <br />begin around November 1, 2008 with completion by the end of November 2008. <br />