My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19 (4)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
19 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:36:45 PM
Creation date
10/2/2008 1:22:50 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/17/2008
Description
ISF Section - Instream Flow Rules Revision Update
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ISF Rule 8i.(3) -Injury With Mitigation <br />(Changes to July 2008 Draft shown in bold) <br />September 8, 2008 Draft <br />8i. Pretrial Resolution. Staff may negotiate a pretrial resolution of any injury <br />or interference issue that is the subject of a Statement of Opposition. The <br />Board shall review the pretrial resolution pursuant to the following <br />procedures: <br />(1) No In' ur . In the event the pretrial resolution includes terms and <br />conditions preventing injury or interference and does not involve a <br />modification, or acceptance of injury or interference with <br />mitigation, the Board is not required to review and ratify the <br />pretrial resolution. Staff may authorize its counsel to sign any court <br />documents necessary to finalize this type of pretrial resolution <br />without Board ratification. <br />(2) No InjurylModification. In the event the pretrial resolution <br />addresses injury or interference through modification of the <br />existing ISF decree, the process set forth in Rule 9 shall be <br />followed prior to any Board decision to ratify the pretrial <br />reso utlon. <br />(3) Injury Accepted with Miti ag tion. In the event ~a proposed <br />pretrial resolution will allow injury to or interference tewith an ISF <br />right, but mitigation offered by the applicant would enable the <br />Board to accept the injury or interference while continuing to <br />preserve or improve the natural environment to a reasonable <br />degree, and if the ro osed pretrial resolution does not include a <br />modification under ISF Rule 9, the Board shall: <br />(a) Conduct a preliminary review of the proposed pretrial <br />resolution during any regular or special meeting to <br />determine whether the natural environment could be <br />preserved or improved to a reasonable degree with the <br />proposed injury or interference if applicant provided <br />mitigation; and; <br />(b) At a later regular or special meeting, take final action to <br />ratify, refuse to ratify or ratify with additional conditions. <br />(c) No ro osed pretrial resolution considered pursuant to this <br />Rule 8i.(3) may receive preliminary review and final <br />ratification mat the same Board meeting. <br />(d) The Board shall not enter into any stipulation or a . rg ee to <br />any decretal terms and conditions under this Rule that <br />would result in the Division of Water Resources being <br />unable to properly administer the affected ISF water <br />
The URL can be used to link to this page
Your browser does not support the video tag.