My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final and Approved July 2008 Minutes
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
Final and Approved July 2008 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 2:14:51 PM
Creation date
10/2/2008 11:12:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/22/2008
Description
Summary Minutes and Record of Decisions - July 22-23, 2008
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />15b. Basin Director Report -Yampa-White River Basin Director Report - Geoff Blakc;slee Reporting <br />Tape 2, Track 1 00:33:45 - 00:37:45 <br />Action: Informational item only, no action required. <br />15c. Basin Director Report -San Juan/San Miguel-Dolores River Basin Director Report -Bruce <br />Whitehead Reporting <br />Tape 2, Track 1 00:37:34 - 00:49:49 <br />Action: Informational item only, no action required. <br />15d. Basin Director Report -Gunnison River Basin Director Report -Keith Catlin Reporting <br />Tape 2, Track 1 00:49:49 - 00:54:30 <br />Action: Informational item only, no action required. <br />15e. Basin Director Report -North Platte River Basin Director Report -Carl Trick Reporting <br />Tape 2, Track 1 00:54:30 - 00:55:48 <br />Action: Informational item only, no action required. <br />15f. Basin Director Report -South Platte River Basin Director Report -Eric Wilkinson Reporting <br />Tape 2, Track 1 00:55:48 - 01:03:30 <br />Action: Informational item only, no action required. <br />15g. Basin Director Report -Arkansas River Basin Director Report -Reed Dils Reporting <br />Tape 2, Track 1 01:03:30 - 01:15:00 <br />Action: Informational item only, no action required. <br />15h. Basin Director Report -City and County of Denver Director Report <br />Action: There was no report from this basin. <br />15i. Basin Director Report -Rio Grande River Basin Director Report -Chair Travis Smith <br />Reporting <br />Tape 2, Track 1 01:15:00 - 01:32:56 <br />Action: Informational item only, no action required. <br />16a. Water Supply Planning and Finance Section -New Project Loans -Louden Irrigating <br />Canal & Res. Co. - Rist Benton Res. Dam Rehab. Project <br />Tape 2, Track 1 01:39:56 - 01:39:41 <br />Action: A motion was made by Eric Wilkinson and seconded by John Redifer to approve staff <br />recommendation that the Board approve a loan not to exceed $263,610 ($261,000 for <br />project costs and $2,610 for the 1% Loan Service Fee) to the Louden Irrigating Canal and <br />Reservoir Company for the Rist Benson Reservoir Dam Repair Project from the <br />Severance Tax Trust Fund Perpetual Base Account, that the terms of the loan shall be a <br />30-year loan at 3.5% per annum, and security for the loan shall be in cornpliance with <br />CWCB Financial Policy #5. The motion was approved unanimously (8-0). <br />16b. Water Supply Planning and Finance Section -New Project Loans -Head€;ate 135 <br />Lateral, Inc. -Headgate 135 Pipeline Project <br />Tape 2, Track 1 01:39:42 - 01:54:31 <br />Action: A motion was made by John Redifer and seconded by Keith Catlin to approve staff <br />recommendation that the Board approve a loan not to exceed $262,600 ($260,000 for <br />project costs and $2,600 for the 1% Loan Service Fee) for engineering and construction <br />costs, to the Headgate 135 Lateral Inc. from the Severance Tax Trust Fund Perpetual <br />Base Account as it relates to the Headgate 135 Pipeline Project. Following construction, <br />the staff further recommends the loan be amended to an amount not to exceed $136,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.